Revision history of "Installation of a floating dock at post 9" (Q6836209)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 09:1009:10, 13 October 2024DG Regio talk contribs 26,642 bytes +26 Set a claim value: summary (P836): O projeto consiste em equipar o único porto público de transporte de mercadorias na Reunião, com uma doca flutuante que permitirá a secagem de navios de média dimensão para serem submetidos a trabalhos de manutenção ou reparação que não são viáveis à tona.

20 March 2024

7 December 2023

19 June 2023

11 June 2023

8 June 2023