Revision history of "Reconstruction of the trail Horní Mísečky – Jestřábí huts" (Q68346)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

15 January 2024

22 December 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 02:1702:17, 25 July 2022DG Regio talk contribs 49,774 bytes +28,801 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

29 November 2021

  • curprev 00:3000:30, 29 November 2021DG Regio talk contribs 14,637 bytes +1,455 Created claim: summary (P836): Le projet résout l’élimination des effets négatifs sur le terrain adjacent de la route dite de Bucharova. La reconstruction du sentier de randonnée Horní Mísečky — Jestřábí boudy situé dans la I. — III. La zone du parc national de Krkonoše sera évitée. La surface du trottoir est endommagée par l’érosion de l’eau et l’utilisation intensive par les visiteurs des montagnes géantes. En outre, au sommet de la route, il a été utilisé dans le passé pou...
  • curprev 00:3000:30, 29 November 2021DG Regio talk contribs 13,182 bytes +124 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 19:3419:34, 23 October 2020DG Regio talk contribs 13,507 bytes +124 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:3419:34, 23 October 2020DG Regio talk contribs 13,383 bytes −125 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:3419:34, 23 October 2020DG Regio talk contribs 13,508 bytes +1,410 Created claim: summary (P836): The project solves the elimination of negative influences on the adjacent terrain of the so-called Buchar way. The elimination takes place by reconstruction of the tourist path Horní Mísečky – Jestřábí bouda located in the I. – III. zone of the Krkonoše National Park. The surface of the pavement is damaged by water erosion and intensive use of visitors to the Giant Mountains. In addition, in the upper part of the road, it was used to repair alka...
  • curprev 19:3419:34, 23 October 2020DG Regio talk contribs 12,098 bytes −897 Removed claim: summary (P836): The project tackles the negative effects on the adjacent “Buchar” terrain. The rest of the region of the Krkonoše basin, located in the zone I — III of the Krkonoky National Park, will be renovated. The surface of the pavement is damaged by water erosion and by intensive use of the Krkonoše. In addition, the upper part of the trip has been used to correct alkaline aggregates in the past, which has a negative impact on the chemistry of the adja...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 19:2619:26, 26 February 2020DG Regio talk contribs 11,708 bytes +897 Created claim: summary (P836): The project tackles the negative effects on the adjacent “Buchar” terrain. The rest of the region of the Krkonoše basin, located in the zone I — III of the Krkonoky National Park, will be renovated. The surface of the pavement is damaged by water erosion and by intensive use of the Krkonoše. In addition, the upper part of the trip has been used to correct alkaline aggregates in the past, which has a negative impact on the chemistry of the adjace...

17 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020