Revision history of "Capacity increase of the TS Velká Bíteš sorting line" (Q68135)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 23:3123:31, 12 October 2024DG Regio talk contribs 49,773 bytes +3 Changed label, description and/or aliases in pt
  • curprev 23:3123:31, 12 October 2024DG Regio talk contribs 49,770 bytes −18 Set a claim value: summary (P836): O objetivo do projeto é aumentar a capacidade da linha de triagem existente em 360 toneladas de resíduos por ano. A tecnologia da linha de triagem permitirá classificar os resíduos recebidos em resíduos adequados para utilização material e resíduos destinados a valorização energética, o que conduzirá a um aumento da percentagem de valorização material e energética dos resíduos na zona de captação. Os custos de execução do projeto são de 5 750 000 CZ...

22 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 01:4601:46, 25 July 2022DG Regio talk contribs 46,092 bytes +26,650 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

29 November 2021

  • curprev 00:2500:25, 29 November 2021DG Regio talk contribs 13,372 bytes +1,425 Created claim: summary (P836): L’objectif du projet est d’augmenter la capacité de la ligne de tri existante de 360 tonnes de déchets par an. La technologie de la ligne de tri permettra de trier les déchets reçus en déchets adaptés à la valorisation des matières et de déchets destinés à la valorisation énergétique, ce qui entraînera une augmentation de la part des matières et de la valorisation énergétique des déchets dans la zone de captage. Le projet fournira une presse pou...
  • curprev 00:2500:25, 29 November 2021DG Regio talk contribs 11,947 bytes +124 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

24 October 2020

  • curprev 09:1309:13, 24 October 2020DG Regio talk contribs 12,272 bytes +114 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:1309:13, 24 October 2020DG Regio talk contribs 12,158 bytes −110 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 09:1309:13, 24 October 2020DG Regio talk contribs 12,268 bytes +1,265 Created claim: summary (P836): The aim of the project is to increase the capacity of the existing sorting line by 360 tons of waste per year.Technology of the sorting line will enable the classification of received waste into waste suitable for material use and waste intended for energy recovery, which will lead to an increase in the share of material and energy recovery of waste in the catchment area. The implementation costs of the project are CZK 5,750,000 without VAT., tr...
  • curprev 09:1309:13, 24 October 2020DG Regio talk contribs 11,003 bytes −779 Removed claim: summary (P836): The project aims to increase the capacity of the existing one over 360 tonnes of waste for a year.Technology transfer lines will allow for the classification of waste streams into waste suitable for material recovery and waste for energy recovery, leading to an increase in the material and energy recovery of waste in the catchment area. The Strike Costs of the project are CZK 5.750.000, exclusive of VAT., remove_old_english_translation

17 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 19:3119:31, 26 February 2020DG Regio talk contribs 10,491 bytes +779 Created claim: summary (P836): The project aims to increase the capacity of the existing one over 360 tonnes of waste for a year.Technology transfer lines will allow for the classification of waste streams into waste suitable for material recovery and waste for energy recovery, leading to an increase in the material and energy recovery of waste in the catchment area. The Strike Costs of the project are CZK 5.750.000, exclusive of VAT., Adding English summary

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020