Revision history of "Modernisation of movable stairs at Palmovka station, east: 311, 312 and 313" (Q67891)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 21:0121:01, 12 October 2024DG Regio talk contribs 47,004 bytes +2 Changed label, description and/or aliases in pt
  • curprev 21:0121:01, 12 October 2024DG Regio talk contribs 47,002 bytes +62 Set a claim value: summary (P836): Projeto «Modernização dos degraus em movimento na estação de Palmovka, leste: 311, 312 e 313" consiste em realizar economias de energia através da modernização das escadas rolantes desatualizadas e com utilização intensiva de energia existentes para escadas rolantes modernas e eficientes do ponto de vista energético, com maior segurança operacional e custos de funcionamento mais baixos. O projeto será realizado na estação de metro de Palmovka.

23 March 2024

15 January 2024

22 December 2023

12 June 2023

20 February 2023

17 February 2023

25 July 2022

  • curprev 01:1301:13, 25 July 2022DG Regio talk contribs 45,242 bytes +25,696 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

29 November 2021

  • curprev 00:2400:24, 29 November 2021DG Regio talk contribs 14,088 bytes +1,249 Created claim: summary (P836): Projet "Modernisation des escaliers en mouvement dans la gare de Palmovka, à l’est: 311, 312 et 313" consiste à réaliser des économies d’énergie grâce à la modernisation des escaliers mécaniques existants, obsolètes et à forte consommation d’énergie, avec des escaliers mécaniques modernes économes en énergie, offrant une plus grande sécurité d’exploitation et des coûts d’exploitation moins élevés., translated_summary
  • curprev 00:2400:24, 29 November 2021DG Regio talk contribs 12,839 bytes +146 Changed label, description and/or aliases in fr: translated_label

29 October 2020

23 October 2020

  • curprev 18:5318:53, 23 October 2020DG Regio talk contribs 13,138 bytes +134 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:5318:53, 23 October 2020DG Regio talk contribs 13,004 bytes −121 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:5318:53, 23 October 2020DG Regio talk contribs 13,125 bytes +1,171 Created claim: summary (P836): Project "Modernisation of Moving Steps at Palmovka Station, East: 311, 312 and 313" consists of achieving energy savings through the modernisation of existing outdated and energy-intensive escalators for modern energy-efficient escalators with higher operational safety and lower operating costs.The project will be realised at Palmovka metro station., translated_summary
  • curprev 18:5318:53, 23 October 2020DG Regio talk contribs 11,954 bytes −699 Removed claim: summary (P836): Project "Modernisation of moving stairs in Palmovka, East: 311, 312 and 313 "consists of achieving energy savings through the modernisation of existing obsolete and highly energy-intensive escalators in modern energy efficient escalators and lower operating costs. the project will be carried out at Palmovka’s metro station., remove_old_english_translation

24 September 2020

21 September 2020

31 August 2020

28 August 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 19:2819:28, 26 February 2020DG Regio talk contribs 10,882 bytes +699 Created claim: summary (P836): Project "Modernisation of moving stairs in Palmovka, East: 311, 312 and 313 "consists of achieving energy savings through the modernisation of existing obsolete and highly energy-intensive escalators in modern energy efficient escalators and lower operating costs. the project will be carried out at Palmovka’s metro station., Adding English summary

17 February 2020

7 February 2020

30 January 2020

28 January 2020

11 January 2020