Revision history of "Modernisation of the waste collection yard – City of Plasy" (Q67865)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 21:0121:01, 12 October 2024DG Regio talk contribs 49,019 bytes −3 Changed label, description and/or aliases in pt
  • curprev 21:0121:01, 12 October 2024DG Regio talk contribs 49,022 bytes −3 Set a claim value: summary (P836): A modernização do parque de recolha Plasy baseia-se na necessidade de melhorar as condições operacionais do parque de recolha. O objetivo do projeto é aumentar a capacidade do estaleiro de recolha, aumentando o número de contentores para a recolha seletiva de resíduos e aumentando as condições (transporte e manuseamento), ou seja, reforçando a superfície do estaleiro de recolha. O local de realização do projeto é o território cadastral da cidade de...

22 March 2024

15 January 2024

12 June 2023

20 February 2023

17 February 2023

25 July 2022

  • curprev 01:1001:10, 25 July 2022DG Regio talk contribs 46,820 bytes +27,432 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

29 November 2021

  • curprev 00:2500:25, 29 November 2021DG Regio talk contribs 13,375 bytes +1,415 Created claim: summary (P836): La modernisation du chantier de collecte Plasy repose sur la nécessité d’améliorer les conditions d’exploitation du chantier de collecte. L’objectif du projet est d’augmenter la capacité du chantier de collecte en augmentant la quantité de conteneurs pour la collecte séparée des déchets et en augmentant les conditions (transport et manutention), c’est-à-dire en renforçant la surface du chantier de collecte. Le lieu de mise en œuvre du projet es...
  • curprev 00:2500:25, 29 November 2021DG Regio talk contribs 11,960 bytes +119 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 18:5218:52, 23 October 2020DG Regio talk contribs 12,290 bytes +119 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:5218:52, 23 October 2020DG Regio talk contribs 12,171 bytes −121 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:5218:52, 23 October 2020DG Regio talk contribs 12,292 bytes +1,358 Created claim: summary (P836): Modernisation of the collection yard Plasy is based on the need to improve the operational conditions of the collection yard. The purpose of the project is to increase the capacity of the collection yard by increasing the number of containers for separate collection of waste and increasing conditions (transport and handling), i.e. strengthening the surface of the collection yard. The place of realisation of the project is the cadastral territor...
  • curprev 18:5218:52, 23 October 2020DG Regio talk contribs 10,934 bytes −892 Removed claim: summary (P836): The modernisation of the Pallas is based on the need to improve the operational conditions of the Court. The purpose of the project is to increase the capacity of the gathering body by increasing the number of containers for separate collection of waste and increasing the conditions (transport and handling), i.e. strengthening the surface of the collection. The place of implementation of the project is the Land cadastral area of the town of P...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 12:2312:23, 26 February 2020DG Regio talk contribs 10,539 bytes +892 Created claim: summary (P836): The modernisation of the Pallas is based on the need to improve the operational conditions of the Court. The purpose of the project is to increase the capacity of the gathering body by increasing the number of containers for separate collection of waste and increasing the conditions (transport and handling), i.e. strengthening the surface of the collection. The place of implementation of the project is the Land cadastral area of the town of Pla...

17 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020