Revision history of "Bulk transport and temporary storage of mixed municipal waste" (Q67696)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 20:5920:59, 12 October 2024DG Regio talk contribs 50,298 bytes +5 Changed label, description and/or aliases in pt
  • curprev 20:5920:59, 12 October 2024DG Regio talk contribs 50,293 bytes +6 Set a claim value: summary (P836): O objetivo do projeto é desenvolver elementos técnicos essenciais que permitam o transporte de misturas de resíduos urbanos (SKO), principalmente através do transporte ferroviário (elétricos, comboios), de modo a minimizar a carga da infraestrutura rodoviária. Outro objetivo da solução proposta é permitir o armazenamento temporário da SKO resultante da sua utilização de energia/materiais, o que permitirá uma compensação a curto prazo pela redução a...

7 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 00:4700:47, 25 July 2022DG Regio talk contribs 47,617 bytes +27,433 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

29 November 2021

  • curprev 00:2000:20, 29 November 2021DG Regio talk contribs 14,323 bytes +1,361 Created claim: summary (P836): L’objectif du projet est le développement d’éléments techniques clés qui permettront le transport des déchets municipaux mixtes (SAW) principalement par le transport ferroviaire (trams, trains), de manière à réduire au minimum la charge sur les infrastructures routières. Un autre objectif de la solution proposée est de permettre la préservation temporaire de l’accord conjoint avant sa valorisation énergétique/matérielle, ce qui permettra de comp...
  • curprev 00:2000:20, 29 November 2021DG Regio talk contribs 12,962 bytes +141 Changed label, description and/or aliases in fr: translated_label

29 October 2020

23 October 2020

  • curprev 19:0319:03, 23 October 2020DG Regio talk contribs 13,266 bytes +120 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:0319:03, 23 October 2020DG Regio talk contribs 13,146 bytes −120 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:0319:03, 23 October 2020DG Regio talk contribs 13,266 bytes +1,258 Created claim: summary (P836): The aim of the project is to develop key technical elements that will enable the transport of mixed municipal waste (SKO) mainly through rail transport (tramways, trains), so that the road infrastructure load is minimised. Another objective of the proposed solution is to allow temporary storage of the SKO from its energy/material use, which will allow short-term compensation for the short-term reduction of waste processing capacities., translate...
  • curprev 19:0319:03, 23 October 2020DG Regio talk contribs 12,008 bytes −781 Removed claim: summary (P836): The project aims at developing key technical elements to enable transport of mixed municipal waste (CROPS) primarily through rail transport (trams, trains) so as to minimise the burden on road infrastructure. Another objective of the proposed solution is to allow the temporary preservation of the JSA in front of its energy/material recovery, allowing a short term adjustment of the waste treatment capacity., remove_old_english_translation

31 August 2020

28 August 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 12:2312:23, 26 February 2020DG Regio talk contribs 11,000 bytes +781 Created claim: summary (P836): The project aims at developing key technical elements to enable transport of mixed municipal waste (CROPS) primarily through rail transport (trams, trains) so as to minimise the burden on road infrastructure. Another objective of the proposed solution is to allow the temporary preservation of the JSA in front of its energy/material recovery, allowing a short term adjustment of the waste treatment capacity., Adding English summary

17 February 2020

6 February 2020

30 January 2020

28 January 2020

11 January 2020