Revision history of "Training of staff of the IROP ZS in the Centre 2016-2017" (Q67553)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 23:2923:29, 12 October 2024DG Regio talk contribs 48,601 bytes +1 Set a claim value: summary (P836): O projeto visa melhorar as qualificações dos trabalhadores do organismo intermediário do IROP no Centro de Desenvolvimento Regional da República Checa (a seguir designado «Centro»), assegurando assim uma execução mais eficiente e melhor do programa operacional do IROP. O projeto baseia-se nas necessidades do IROP ZS, que fazem parte do plano de formação do Centro e dos planos de formação individuais de cada colaborador.

20 March 2024

15 January 2024

22 December 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 00:2500:25, 25 July 2022DG Regio talk contribs 44,980 bytes +25,667 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

29 November 2021

  • curprev 00:2000:20, 29 November 2021DG Regio talk contribs 13,740 bytes +1,304 Created claim: summary (P836): Le projet vise à assurer l’amélioration des compétences du personnel de l’organisme intermédiaire de l’IROP au Centre pour le développement régional de la République tchèque (ci-après dénommé «le Centre») afin d’assurer une mise en œuvre plus efficace et meilleure du programme opérationnel de l’IROP. Le projet est fondé sur les besoins de l’IROP WS, qui font partie du plan de formation du Centre et des plans de formation individuels de chaque em...
  • curprev 00:2000:20, 29 November 2021DG Regio talk contribs 12,436 bytes +113 Changed label, description and/or aliases in fr: translated_label

29 October 2020

23 October 2020

  • curprev 18:5918:59, 23 October 2020DG Regio talk contribs 12,768 bytes +115 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:5918:59, 23 October 2020DG Regio talk contribs 12,653 bytes −110 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:5918:59, 23 October 2020DG Regio talk contribs 12,763 bytes +1,258 Created claim: summary (P836): The project aims to improve the qualifications of employees of the IROP intermediary body in the Centre for Regional Development of the Czech Republic (hereinafter referred to as the “Centre”) and thus ensure a more efficient and better implementation of the IROP operational programme. The project is based on the needs of the IROP ZS, which are part of the training plan of the Centre and individual training plans of each employee., translated_su...
  • curprev 18:5918:59, 23 October 2020DG Regio talk contribs 11,505 bytes −836 Removed claim: summary (P836): The purpose of the project is to increase the qualifications of the staff of the intermediate body IROP at the Centre for Regional Development of the Czech Republic (hereinafter referred to as ‘Centrum’), thereby ensuring a more efficient and better quality of the implementation of the IROP operating programme. The project is based on the needs of the IB IROP which are part of the training plan of the Centre and individual training plans for e...

24 September 2020

21 September 2020

31 August 2020

28 August 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 19:2219:22, 26 February 2020DG Regio talk contribs 10,564 bytes +836 Created claim: summary (P836): The purpose of the project is to increase the qualifications of the staff of the intermediate body IROP at the Centre for Regional Development of the Czech Republic (hereinafter referred to as ‘Centrum’), thereby ensuring a more efficient and better quality of the implementation of the IROP operating programme. The project is based on the needs of the IB IROP which are part of the training plan of the Centre and individual training plans for eac...

17 February 2020

6 February 2020

30 January 2020

11 January 2020