Revision history of "Composters for the City of Real" (Q67525)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

22 December 2023

12 June 2023

20 February 2023

17 February 2023

25 July 2022

  • curprev 00:1900:19, 25 July 2022DG Regio talk contribs 44,946 bytes +26,248 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

29 November 2021

  • curprev 00:1900:19, 29 November 2021DG Regio talk contribs 13,073 bytes +1,333 Created claim: summary (P836): Le plan de projet est l’acquisition de 200 morceaux de composteurs de jardin (100 pcs — 1 000 l, 100 pcs — 2 000 l), 1 déchiqueteuse. Les composteurs d’un volume total de 300 000 l peuvent accueillir environ 180 tonnes de résidus végétaux potentiellement présents dans la zone d’intérêt. Le résultat sera la prévention des biodéchets dans la municipalité et la gestion globale durable des déchets, la prévention de la perte de nutriments, l’éducatio...
  • curprev 00:1900:19, 29 November 2021DG Regio talk contribs 11,740 bytes +92 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 18:4718:47, 23 October 2020DG Regio talk contribs 12,097 bytes +90 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:4718:47, 23 October 2020DG Regio talk contribs 12,007 bytes −96 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:4718:47, 23 October 2020DG Regio talk contribs 12,103 bytes +1,270 Created claim: summary (P836): The plan of the project is to acquire 200 garden composters (100 pcs – 1000 l, 100 pcs – 2000 l), 1 chipper. Composters with a total volume of 300.000 l are able to accommodate about 180 tonnes of plant residues potentially occurring in the area of interest. The result will be prevention of the emergence of biowaste in the municipality and overall sustainable waste management, prevention of nutrient loss, education and motivation of citizens., t...
  • curprev 18:4718:47, 23 October 2020DG Regio talk contribs 10,833 bytes −815 Removed claim: summary (P836): The project plan is to acquire the 200 pieces of garden compost (100-1 000 l, 100 % -2 000 l), 1 fissionable protected ones. Compost of a total volume of 300.000 l is able to accommodate about 180 tonnes of plant residues potentially originating in the pet territory. The result will be the prevention of bio-waste in the community and the overall sustainable waste management, nutrient loss prevention, education and citizen motivation., remove_o...

17 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 19:2519:25, 26 February 2020DG Regio talk contribs 10,357 bytes +815 Created claim: summary (P836): The project plan is to acquire the 200 pieces of garden compost (100-1 000 l, 100 % -2 000 l), 1 fissionable protected ones. Compost of a total volume of 300.000 l is able to accommodate about 180 tonnes of plant residues potentially originating in the pet territory. The result will be the prevention of bio-waste in the community and the overall sustainable waste management, nutrient loss prevention, education and citizen motivation., Adding Eng...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020