Revision history of "Establishment and operation of the Tulip Community Centre in Horní Suchá" (Q67306)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 09:0109:01, 13 October 2024DG Regio talk contribs 52,462 bytes +5 Changed label, description and/or aliases in pt
  • curprev 09:0109:01, 13 October 2024DG Regio talk contribs 52,457 bytes +16 Set a claim value: summary (P836): Em cooperação com o município de Horní Suchá, o Centro Comunitário (KC) será construído num edifício que o município está a reconstruir para o efeito. A Associação Tulipán cobrirá o trabalho social-comunitário neste edifício para todo o município em que há uma grande localidade excluída. KC está localizado no centro da aldeia, perto de ambas as escolas. O objetivo do KC é integrar as pessoas da CS na vida do município, a sua ligação com outros habit...

23 March 2024

15 January 2024

11 June 2023

17 February 2023

24 July 2022

  • curprev 23:4723:47, 24 July 2022DG Regio talk contribs 49,771 bytes +28,742 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

29 November 2021

  • curprev 00:2000:20, 29 November 2021DG Regio talk contribs 14,699 bytes +1,497 Created claim: summary (P836): En coopération avec la municipalité de Horní Suchá, le Centre communautaire (KC) sera construit dans un bâtiment que la municipalité est en train de reconstruire à cette fin. L’association Tulipán couvrira le travail social et communautaire dans ce bâtiment pour l’ensemble de la communauté dans laquelle se trouve une grande localité exclue. KC est situé dans le centre du village, près des deux écoles. L’objectif du KC est d’intégrer les gens de...
  • curprev 00:2000:20, 29 November 2021DG Regio talk contribs 13,202 bytes +139 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 13:5713:57, 23 October 2020DG Regio talk contribs 13,512 bytes +133 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 13:5713:57, 23 October 2020DG Regio talk contribs 13,379 bytes −130 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 13:5713:57, 23 October 2020DG Regio talk contribs 13,509 bytes +1,447 Created claim: summary (P836): In cooperation with the municipality Horní Suchá, the Community Centre (KC) will be built in a building that the municipality is reconstructing for this purpose. The Tulipán Association will cover social-community work in this building for the entire municipality in which there is a large excluded locality. KC is located in the center of the village, close to both schools. The aim of the KC is to integrate people from CS into the life of the mun...
  • curprev 13:5713:57, 23 October 2020DG Regio talk contribs 12,062 bytes −979 Removed claim: summary (P836): In cooperation with the municipality of Upper Suchá, the Community will build a community centre (KC) in a building that is refurbished for this purpose by the municipality. In this building, the Tulipair is an umbrella for community work for the whole municipality where a large area of exclusion is present. KC is located in the centre, near both schools. The objective of the KC is to integrate people from the CS into the life of the municipal...

17 July 2020

7 June 2020

25 March 2020

26 February 2020

  • curprev 19:2619:26, 26 February 2020DG Regio talk contribs 11,750 bytes +979 Created claim: summary (P836): In cooperation with the municipality of Upper Suchá, the Community will build a community centre (KC) in a building that is refurbished for this purpose by the municipality. In this building, the Tulipair is an umbrella for community work for the whole municipality where a large area of exclusion is present. KC is located in the centre, near both schools. The objective of the KC is to integrate people from the CS into the life of the municipalit...

17 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020