Revision history of "Supporting repair and increasing the resilience of the health system by equipping the Independent Public Healthcare Plant in Krotoszyn." (Q6727243)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 09:0109:01, 13 October 2024DG Regio talk contribs 76,605 bytes +26 Changed label, description and/or aliases in pt
  • curprev 09:0109:01, 13 October 2024DG Regio talk contribs 76,579 bytes +1 Set a claim value: summary (P836): O investimento consiste em equipar o SPZOZ em Krotoszyn, realizando os trabalhos de adaptação necessários para o diagnóstico das rpm. O projeto abrange medidas destinadas a adaptar a infraestrutura do SPZOZ às necessidades decorrentes direta e indiretamente da pandemia de COVID-19. Como resultado da implementação da pres. O hospital reconstruirá os recursos explorados durante a crise da COVID-19, reforçará a resiliência do sistema de saúde e aumenta...

22 March 2024

13 December 2023

28 May 2023