Revision history of "Improved safety at four pedestrian crossings at ul. 3 May and construction of a stationary bicycle town at Primary School No. 4 in Ostrów Mazowiecki" (Q6725341)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 23:2623:26, 12 October 2024DG Regio talk contribs 57,665 bytes −10 Changed label, description and/or aliases in pt
  • curprev 23:2623:26, 12 October 2024DG Regio talk contribs 57,675 bytes +18 Set a claim value: summary (P836): O projecto pressupõe a implementação de quatro passagens pedonais activas localizadas na cidade de Ostrów Mazowiecka em ul. 3 de maio, com o estatuto de via pública de classe Z, incluindo: • dois passes perto da Escola Primária n.o 1 (no mapa assinalado com os n.os 1 e 2), • um passe perto da Câmara Municipal (no mapa assinalado com o n.o 3), • um passe perto do cinema de Ostrovia (no mapa assinalado com o n.o 4). A tarefa consistirá em melhorar a m...

12 March 2024

13 December 2023

28 May 2023