Revision history of "Improvement of the system of separate collection of recoverable waste parts in the Telč microregion" (Q66920)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 11:3411:34, 12 October 2024DG Regio talk contribs 48,908 bytes +4 Changed label, description and/or aliases in pt
  • curprev 11:3411:34, 12 October 2024DG Regio talk contribs 48,904 bytes +1 Set a claim value: summary (P836): O objetivo do projeto é melhorar o atual sistema de gestão de componentes de resíduos valorizáveis através da aquisição de contentores, contentores de grande volume e trituradores na zona de influência do projeto. A execução do projeto contribuirá para aumentar a operacionalidade, a flexibilidade e a qualidade global do sistema de recolha seletiva de resíduos valorizáveis na bacia hidrográfica.

7 March 2024

15 January 2024

12 June 2023

17 February 2023

24 July 2022

  • curprev 22:5422:54, 24 July 2022DG Regio talk contribs 45,720 bytes +26,351 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

29 November 2021

  • curprev 00:1400:14, 29 November 2021DG Regio talk contribs 13,677 bytes +1,261 Created claim: summary (P836): L’objectif du projet est d’améliorer le système existant de gestion des composants de déchets utilisables par l’acquisition de conteneurs, de conteneurs de gros volumes et de déchiqueteuses dans le bassin versant du projet. La mise en œuvre du projet contribuera à accroître le caractère opérationnel, la flexibilité et la qualité globale du système de collecte séparée des déchets récupérables dans le bassin versant., translated_summary
  • curprev 00:1400:14, 29 November 2021DG Regio talk contribs 12,416 bytes +180 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 18:2518:25, 23 October 2020DG Regio talk contribs 12,685 bytes +160 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:2518:25, 23 October 2020DG Regio talk contribs 12,525 bytes −168 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:2518:25, 23 October 2020DG Regio talk contribs 12,693 bytes +1,230 Created claim: summary (P836): The aim of the project is to improve the existing system of management of recoverable waste components through the acquisition of containers, large volume containers and chipper within the project’s catchment area. The implementation of the project will contribute to increasing the operational, flexibility and overall quality of the system of separate collection of recoverable waste in the catchment area., translated_summary
  • curprev 18:2518:25, 23 October 2020DG Regio talk contribs 11,463 bytes −764 Removed claim: summary (P836): The purpose of the project is to improve the existing system for dealing with usable components of waste, through the purchase of vessels, bulk containers and gas collecting within the catchment area of the project. The implementation of the project will contribute to increasing the operationalisation, flexibility and overall quality of the separate collection system in the catchment area., remove_old_english_translation

22 September 2020

17 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 12:1112:11, 26 February 2020DG Regio talk contribs 10,938 bytes +764 Created claim: summary (P836): The purpose of the project is to improve the existing system for dealing with usable components of waste, through the purchase of vessels, bulk containers and gas collecting within the catchment area of the project. The implementation of the project will contribute to increasing the operationalisation, flexibility and overall quality of the separate collection system in the catchment area., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020