Revision history of "Supporting the process of medium-term planning of the development of social services in the Region of Karlovy Vary II" (Q65803)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 23:1823:18, 12 October 2024DG Regio talk contribs 53,541 bytes +7 Set a claim value: summary (P836): O projeto centra-se na preparação e no tratamento do SPRSS na região de Karlovy Vary para o período 2021-2023 e nos planos de ação para 2021, 2022 e 2023, incluindo a atualização e o desenvolvimento de documentos conceptuais subjacentes, ou seja, a análise custo-eficácia, a revisão do processo de acesso à rede e a determinação da compensação, a revisão do sistema de acompanhamento e as atividades de controlo. Através da formação profissional e do ap...

7 March 2024

15 January 2024

11 June 2023

17 February 2023

24 July 2022

  • curprev 20:1520:15, 24 July 2022DG Regio talk contribs 50,352 bytes +29,901 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

28 November 2021

  • curprev 23:5923:59, 28 November 2021DG Regio talk contribs 14,225 bytes +1,464 Created claim: summary (P836): Le projet se concentre sur la préparation et l’élaboration du SPRSS dans la région de Karlovy Vary pour la période 2021-2023 et des plans d’action pour 2021,2022,2023, y compris la mise à jour et la création de documents conceptuels sous-jacents, c’est-à-dire l’analyse des coûts, la révision du processus d’entrée dans le réseau et de fixation de la compensation, la révision du système d’activités de suivi et de contrôle. Grâce à la formation pro...
  • curprev 23:5923:59, 28 November 2021DG Regio talk contribs 12,761 bytes +187 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 18:3818:38, 23 October 2020DG Regio talk contribs 13,027 bytes +177 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:3718:37, 23 October 2020DG Regio talk contribs 12,850 bytes −168 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:3718:37, 23 October 2020DG Regio talk contribs 13,018 bytes +1,395 Created claim: summary (P836): The project focuses on the preparation and processing of the SPRSS in the Karlovy Vary Region for the period 2021-2023 and the Action Plans for the years 2021,2022,2023 including up-to-date and development of underlying conceptual documents, i.e. cost-effectiveness analysis, revision of the process of access to the network and determination of compensation, revision of the monitoring system and control activities.Through the provided vocational...
  • curprev 18:3718:37, 23 October 2020DG Regio talk contribs 11,623 bytes −957 Removed claim: summary (P836): The project focuses on the preparation and processing of the SPRSS in the Karlovy Vary Region for the period 2021-2023 and the Action Plans for 2021,2022,2023 vreference for the period — and the drawing up of the underlying policy documents, i.e. the analysis of cost rates, the revision of the process of entry into the grid and the setting of compensation payments, the revision of the monitoring system and the control activities.Through the tr...

22 September 2020

17 July 2020

7 June 2020

25 March 2020

26 February 2020

  • curprev 11:5311:53, 26 February 2020DG Regio talk contribs 11,297 bytes +957 Created claim: summary (P836): The project focuses on the preparation and processing of the SPRSS in the Karlovy Vary Region for the period 2021-2023 and the Action Plans for 2021,2022,2023 vreference for the period — and the drawing up of the underlying policy documents, i.e. the analysis of cost rates, the revision of the process of entry into the grid and the setting of compensation payments, the revision of the monitoring system and the control activities.Through the trai...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020