Revision history of "Improvement of the system of separate collection of recoverable waste in the Microregion of Telč" (Q65341)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 11:2911:29, 12 October 2024DG Regio talk contribs 51,221 bytes −4 Set a claim value: summary (P836): O objetivo do projeto é melhorar o atual sistema de gestão de componentes de resíduos valorizáveis através da aquisição de contentores, contentores de grande volume, trituradores e porta-contentores para trator (reboque) e da revitalização/modificação de povoamentos de contentores na zona de influência do projeto. A execução do projeto contribuirá para aumentar a operacionalidade, a flexibilidade e a qualidade global do sistema de recolha seletiva d...

22 March 2024

15 January 2024

12 June 2023

17 February 2023

24 July 2022

  • curprev 19:0619:06, 24 July 2022DG Regio talk contribs 48,553 bytes +28,034 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

28 November 2021

  • curprev 23:5423:54, 28 November 2021DG Regio talk contribs 14,467 bytes +1,368 Created claim: summary (P836): L’objectif du projet est d’améliorer le système existant de gestion des composants de déchets utilisables par l’acquisition de conteneurs, conteneurs de gros volumes, déchiqueteuses et porte-conteneurs derrière le tracteur (remorque) et la revitalisation/ajustement des peuplements de conteneurs dans le bassin versant du projet. La mise en œuvre du projet contribuera à accroître le caractère opérationnel, la flexibilité et la qualité globale du s...
  • curprev 23:5423:54, 28 November 2021DG Regio talk contribs 13,099 bytes +168 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 13:0713:07, 23 October 2020DG Regio talk contribs 13,380 bytes +156 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 13:0713:07, 23 October 2020DG Regio talk contribs 13,224 bytes −146 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 13:0713:07, 23 October 2020DG Regio talk contribs 13,370 bytes +1,328 Created claim: summary (P836): The object of the project is to improve the existing system of management of recoverable waste components through the acquisition of containers, large volume containers, chippers and container carriers for tractor (trailer) and revitalisation/modification of container stands within the project’s catchment area. The implementation of the project will contribute to increasing the operational, flexibility and overall quality of the system of separa...
  • curprev 13:0713:07, 23 October 2020DG Regio talk contribs 12,042 bytes −857 Removed claim: summary (P836): The purpose of the project is to improve the existing system for dealing with exploitable components of waste, through the procurement of containers, bulk containers, chippers and containers for tractor (trailer) and the revitalisation/adaptation of container leaves within the catchment area of the project. The implementation of the project will contribute to increasing the operationalisation, flexibility and overall quality of the separate co...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 12:1912:19, 26 February 2020DG Regio talk contribs 11,639 bytes +857 Created claim: summary (P836): The purpose of the project is to improve the existing system for dealing with exploitable components of waste, through the procurement of containers, bulk containers, chippers and containers for tractor (trailer) and the revitalisation/adaptation of container leaves within the catchment area of the project. The implementation of the project will contribute to increasing the operationalisation, flexibility and overall quality of the separate coll...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020