Revision history of "Establishment of a collection yard in the village of Baška" (Q65284)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 08:5008:50, 13 October 2024DG Regio talk contribs 48,216 bytes −6 Changed label, description and/or aliases in pt
  • curprev 08:5008:50, 13 October 2024DG Regio talk contribs 48,222 bytes −13 Set a claim value: summary (P836): O objetivo do projeto é construir um novo pátio de recolha na aldeia de Baška, ocre. Frýdek-Místek, região da Morávia-Silésia. Será construída a capacidade de separação de resíduos no volume de 303 toneladas/ano. Vão tratar disso. 3 toneladas de resíduos perigosos, 15 toneladas de valorização e as restantes (284 toneladas) serão constituídas por outros resíduos. A parte de construção do projeto será realizada apenas no terreno 1125/3 k.ú (edifício)....

7 March 2024

15 January 2024

22 December 2023

12 June 2023

17 February 2023

24 July 2022

  • curprev 18:5718:57, 24 July 2022DG Regio talk contribs 46,060 bytes +26,869 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

28 November 2021

  • curprev 23:5423:54, 28 November 2021DG Regio talk contribs 13,339 bytes +1,379 Created claim: summary (P836): L’objet du projet est la construction d’une nouvelle cour de collecte dans le village de Baška, okr. Frýdek-Místek, Région Moravie-Silésienne. La capacité de séparation des déchets en volume de 303 tonnes par an sera construite. Dont ils s’occuperont. 3 tonnes sont des déchets dangereux, 15 tonnes sont reprises et le reste (284 tonnes) sera constitué d’autres déchets. La partie construction du projet ne sera mise en œuvre que sur un terrain de 1...
  • curprev 23:5423:54, 28 November 2021DG Regio talk contribs 11,960 bytes +124 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 13:0613:06, 23 October 2020DG Regio talk contribs 12,285 bytes +118 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 13:0613:06, 23 October 2020DG Regio talk contribs 12,167 bytes −177 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 13:0613:06, 23 October 2020DG Regio talk contribs 12,344 bytes +1,344 Created claim: summary (P836): The object of the project is to build a new collection yard in the village of Baška, ochre. Frýdek-Místek, Moravian-Silesian Region.The capacity for separating waste in the volume of 303 tonnes/year will be built. They'll be about that. 3 tonnes of hazardous waste, 15 tonnes of recovery and the remainder (284 tonnes) will consist of other wastes. The construction part of the project will be realised only on plot 1125/3 k.ú (building). Pussycats...
  • curprev 13:0613:06, 23 October 2020DG Regio talk contribs 11,000 bytes −886 Removed claim: summary (P836): The project concerns the creation of a new collection point in the municipality of Baška, okr. Frýdek-Místek, Moravskoslezsky Kra.It will build up a waste separation capacity of 303 tonnes/year. This will be around. 3 tonnes constitute hazardous waste, 15 tonnes of return and the rest (284 tonnes) will consist of other wastes. The construction part of the project will be carried out only on 1125/3 cadastral (building). Kunčičky. In addition, 3...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 12:1812:18, 26 February 2020DG Regio talk contribs 10,612 bytes +886 Created claim: summary (P836): The project concerns the creation of a new collection point in the municipality of Baška, okr. Frýdek-Místek, Moravskoslezsky Kra.It will build up a waste separation capacity of 303 tonnes/year. This will be around. 3 tonnes constitute hazardous waste, 15 tonnes of return and the rest (284 tonnes) will consist of other wastes. The construction part of the project will be carried out only on 1125/3 cadastral (building). Kunčičky. In addition, 3 x...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020