Revision history of "Separate collection of waste in Hostouň" (Q65092)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 23:1723:17, 12 October 2024DG Regio talk contribs 47,344 bytes +6 Set a claim value: summary (P836): O objectivo do projecto é alargar o sistema de separação de resíduos na zona de captação. Nesta fase, a cidade está a tentar tirar o máximo partido dos seus esforços para melhorar o sistema de separação de resíduos em Hostouň, a fim de melhorar a quantidade de resíduos urbanos que foram triados. Além disso, estes resíduos serão exportados para posterior tratamento e valorização de materiais.

22 March 2024

15 January 2024

22 December 2023

6 July 2023

12 June 2023

17 February 2023

24 July 2022

  • curprev 18:2518:25, 24 July 2022DG Regio talk contribs 43,635 bytes +24,942 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

28 November 2021

  • curprev 23:4723:47, 28 November 2021DG Regio talk contribs 13,407 bytes +1,248 Created claim: summary (P836): Le projet vise à étendre le système de séparation des déchets dans le bassin versant. Avec cette étape, la ville s’efforce d’apporter la meilleure contribution possible à l’amélioration du système de séparation des déchets existant à Hostouň afin d’augmenter la quantité de déchets municipaux triés. En outre, ces déchets seront transportés en vue d’un traitement et d’une valorisation ultérieurs., translated_summary
  • curprev 23:4723:47, 28 November 2021DG Regio talk contribs 12,159 bytes +102 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 12:3312:33, 23 October 2020DG Regio talk contribs 12,506 bytes +99 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:3312:33, 23 October 2020DG Regio talk contribs 12,407 bytes −110 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:3312:33, 23 October 2020DG Regio talk contribs 12,517 bytes +1,182 Created claim: summary (P836): The aim of the project is to extend the system of separation of waste in the catchment area. By this step, the city is trying to make the most of its efforts to improve the system of waste separation in Hostouň to improve the amount of municipal waste that has been sorted. Furthermore, these wastes will be exported for further material treatment and recovery., translated_summary
  • curprev 12:3312:33, 23 October 2020DG Regio talk contribs 11,335 bytes −741 Removed claim: summary (P836): The project aims at extending the waste separation system in the catchment area. By doing this, the city is trying to make the most of the improved waste separation system put in place in the city of Hoaston, with an increase in the quantity of municipal waste recovered. In addition, such wastes will be weighed for further material processing and recovery operations., remove_old_english_translation

24 September 2020

22 September 2020

17 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 12:0712:07, 26 February 2020DG Regio talk contribs 10,820 bytes +741 Created claim: summary (P836): The project aims at extending the waste separation system in the catchment area. By doing this, the city is trying to make the most of the improved waste separation system put in place in the city of Hoaston, with an increase in the quantity of municipal waste recovered. In addition, such wastes will be weighed for further material processing and recovery operations., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020