Revision history of "Staver Luže s.r.o. – Recycling of waste" (Q64840)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 08:5008:50, 13 October 2024DG Regio talk contribs 47,177 bytes 0 Changed label, description and/or aliases in pt
  • curprev 08:5008:50, 13 October 2024DG Regio talk contribs 47,177 bytes +1 Set a claim value: summary (P836): O objectivo do projecto é alargar o sistema de separação de resíduos na zona de captação. Nesta fase, o município está a tentar dar o melhor contributo possível para melhorar o sistema de separação de resíduos em Luže e nas suas partes locais, a fim de melhorar a quantidade de resíduos urbanos que foram triados. Além disso, estes resíduos serão exportados para posterior tratamento e valorização de materiais.

23 March 2024

15 January 2024

12 June 2023

17 February 2023

24 July 2022

  • curprev 17:4817:48, 24 July 2022DG Regio talk contribs 43,990 bytes +25,350 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

28 November 2021

  • curprev 23:4723:47, 28 November 2021DG Regio talk contribs 13,448 bytes +1,234 Created claim: summary (P836): Le projet vise à étendre le système de séparation des déchets dans le bassin versant. Avec cette étape, la municipalité cherche à tirer le meilleur parti du système de séparation des déchets en place à Luže et de ses parties locales afin d’améliorer la quantité de déchets municipaux triés. En outre, ces déchets seront transportés en vue d’un traitement et d’une valorisation ultérieurs., translated_summary
  • curprev 23:4723:47, 28 November 2021DG Regio talk contribs 12,214 bytes +105 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 14:0014:00, 23 October 2020DG Regio talk contribs 12,558 bytes +101 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:0014:00, 23 October 2020DG Regio talk contribs 12,457 bytes −101 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:0014:00, 23 October 2020DG Regio talk contribs 12,558 bytes +1,214 Created claim: summary (P836): The aim of the project is to extend the system of separation of waste in the catchment area. By this step, the municipality is trying to make the best possible contribution to improve the system of waste separation in Luže and its local parts to improve the amount of municipal waste that has been sorted. Furthermore, these wastes will be exported for further material treatment and recovery., translated_summary
  • curprev 14:0014:00, 23 October 2020DG Regio talk contribs 11,344 bytes −773 Removed claim: summary (P836): The project aims at extending the waste separation system in the catchment area. By way of this step, the municipality seeks to make the most of the fact that the system of waste separation set up so far in Luanda and its local parts is improved, thus increasing the amount of municipal waste recovered. In addition, such wastes will be weighed for further material processing and recovery operations., remove_old_english_translation

17 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 11:5511:55, 26 February 2020DG Regio talk contribs 10,826 bytes +773 Created claim: summary (P836): The project aims at extending the waste separation system in the catchment area. By way of this step, the municipality seeks to make the most of the fact that the system of waste separation set up so far in Luanda and its local parts is improved, thus increasing the amount of municipal waste recovered. In addition, such wastes will be weighed for further material processing and recovery operations., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020