Revision history of "Collection yard construction work" (Q64022)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 08:4508:45, 13 October 2024DG Regio talk contribs 48,817 bytes −4 Changed label, description and/or aliases in pt
  • curprev 08:4508:45, 13 October 2024DG Regio talk contribs 48,821 bytes −9 Set a claim value: summary (P836): O novo parque de recolha permitirá a eliminação de todos os resíduos provenientes das atividades dos residentes do município, nomeadamente resíduos volumosos, vidro, papel, plástico, metal, resíduos perigosos, detritos de edifícios, resíduos biodegradáveis e ainda a valorização de equipamentos elétricos. A receção dos resíduos será supervisionada pelo serviço do parque de recolha, garantindo assim a separação de todos os componentes dos resíduos val...

23 March 2024

15 January 2024

12 June 2023

17 February 2023

24 July 2022

  • curprev 15:4215:42, 24 July 2022DG Regio talk contribs 45,644 bytes +26,370 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 22:0522:05, 2 December 2021DG Regio talk contribs 15,006 bytes +1,280 Created claim: summary (P836): Die neue Sammelstelle wird die Entsorgung aller Abfälle ermöglichen, die aus den Tätigkeiten der Bewohner der Gemeinde entstehen, insbesondere sperrige Abfälle, Glas, Papier, Kunststoff, Metall, gefährliche Abfälle, Baumüll, biologisch abbaubare Abfälle sowie die Rücknahme elektrischer Anlagen. Die Aufnahme von Abfällen erfolgt unter Aufsicht des Betreibers der Sammelstelle und gewährleistet so die Trennung aller verwertbaren Abfallbestandteile....
  • curprev 22:0522:05, 2 December 2021DG Regio talk contribs 13,726 bytes +79 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 23:3323:33, 28 November 2021DG Regio talk contribs 13,647 bytes +1,363 Created claim: summary (P836): Le nouveau chantier de collecte permettra l’élimination de tous les déchets provenant des activités des habitants de la commune, en particulier les déchets volumineux, le verre, le papier, le plastique, les métaux, les déchets dangereux, les débris de construction, les déchets biodégradables, ainsi que la reprise des équipements électriques. La réception des déchets sera effectuée sous la supervision de l’exploitant du chantier de collecte, assu...
  • curprev 23:3323:33, 28 November 2021DG Regio talk contribs 12,284 bytes +96 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 18:0618:06, 23 October 2020DG Regio talk contribs 12,637 bytes +92 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:0618:06, 23 October 2020DG Regio talk contribs 12,545 bytes −119 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:0618:06, 23 October 2020DG Regio talk contribs 12,664 bytes +1,254 Created claim: summary (P836): The new collection yard will allow the disposal of all waste arising from the activities of the residents of the municipality, in particular bulky waste, glass, paper, plastic, metal, hazardous waste, building debris, biodegradable waste and also the recovery of electrical equipment. The reception of waste will be supervised by the service of the collection yard, thereby ensuring the separation of all recoverable waste components., translated_su...
  • curprev 18:0618:06, 23 October 2020DG Regio talk contribs 11,410 bytes −813 Removed claim: summary (P836): The new gathering of the Court will allow for the postponement of all waste generated by the activities of the population of the municipality, in particular bulky waste, glass, plastic, metal, metal, waste, construction, biodegradable waste, and the take-back of electrical equipment. The reception of waste will be carried out under the control of the assembly of the Court, thus ensuring the separation of all recoverable waste components., remo...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 11:4711:47, 26 February 2020DG Regio talk contribs 10,951 bytes +813 Created claim: summary (P836): The new gathering of the Court will allow for the postponement of all waste generated by the activities of the population of the municipality, in particular bulky waste, glass, plastic, metal, metal, waste, construction, biodegradable waste, and the take-back of electrical equipment. The reception of waste will be carried out under the control of the assembly of the Court, thus ensuring the separation of all recoverable waste components., Adding...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020