Revision history of "ZTV RD Třebětice – reconstruction of the sidewalk" (Q63918)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 08:4208:42, 13 October 2024DG Regio talk contribs 51,490 bytes 0 Changed label, description and/or aliases in pt
  • curprev 08:4208:42, 13 October 2024DG Regio talk contribs 51,490 bytes +12 Set a claim value: summary (P836): É uma reconstrução da estrada pedonal na parte norte da aldeia Třebětice ao longo da estrada local. O pavimento é atualmente insatisfatório, tanto em termos de segurança como de ausência de barreiras e de parâmetros de altura. O pavimento atual não é construído sem barreiras e, devido à superfície de asfalto recém-construída da estrada, houve uma mudança de parâmetros de altura. Dentro do projeto será reconstruído o comprimento da estrada pedonal de...

20 March 2024

15 January 2024

22 December 2023

6 July 2023

12 June 2023

17 February 2023

24 July 2022

  • curprev 15:2715:27, 24 July 2022DG Regio talk contribs 47,264 bytes +27,697 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

28 November 2021

  • curprev 23:3323:33, 28 November 2021DG Regio talk contribs 13,481 bytes +1,456 Created claim: summary (P836): Il s’agit d’une reconstruction de la route piétonne dans la partie nord du village de Třebětice le long de la route locale. À l’heure actuelle, la chaussée n’est plus satisfaisante, tant du point de vue de la sécurité, de l’absence d’obstacles que des paramètres de hauteur. La chaussée actuelle n’est pas sans barrières, et grâce à la surface asphaltée nouvellement construite de la route, les paramètres de hauteur ont changé. Dans le cadre du pro...
  • curprev 23:3323:33, 28 November 2021DG Regio talk contribs 12,025 bytes +108 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 18:0318:03, 23 October 2020DG Regio talk contribs 12,366 bytes +112 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:0318:03, 23 October 2020DG Regio talk contribs 12,254 bytes −113 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:0318:03, 23 October 2020DG Regio talk contribs 12,367 bytes +1,372 Created claim: summary (P836): It is a reconstruction of the pedestrian road in the northern part of the village Třebětice along the local road. The pavement is currently unsatisfactory, both in terms of safety and barrier-freeness and height parameters. The current pavement is not built barrier-free, and due to the newly built asphalt surface of the road there has been a change of height parameters. Within the project will be reconstructed pedestrian road length of 115 m wit...
  • curprev 18:0318:03, 23 October 2020DG Regio talk contribs 10,995 bytes −956 Removed claim: summary (P836): It is a reconstruction of the pedestrian communication in the northern part of the municipality of Třeboň along a local road. The pavement is currently inadequate, both in terms of safety as well as barrier-free and elevation parameters. The current walkway is not built on an obstacle, and there has been a change in the height parameters due to the newly constructed asphalt surface of the communication. The project will lead to the reconstruct...

21 September 2020

31 August 2020

28 August 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 11:3711:37, 26 February 2020DG Regio talk contribs 10,150 bytes +956 Created claim: summary (P836): It is a reconstruction of the pedestrian communication in the northern part of the municipality of Třeboň along a local road. The pavement is currently inadequate, both in terms of safety as well as barrier-free and elevation parameters. The current walkway is not built on an obstacle, and there has been a change in the height parameters due to the newly constructed asphalt surface of the communication. The project will lead to the reconstructio...

17 February 2020

6 February 2020

30 January 2020

28 January 2020

11 January 2020