Revision history of "II/409 UHERČICE – RETURNING – RANCÍŘOV, SECTION 2" (Q63909)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 08:4308:43, 13 October 2024DG Regio talk contribs 51,227 bytes 0 Changed label, description and/or aliases in pt
  • curprev 08:4308:43, 13 October 2024DG Regio talk contribs 51,227 bytes +16 Set a claim value: summary (P836): O objetivo do projeto consiste na nova construção do percurso pedonal em falta ao longo da estrada III/40928 que liga a aldeia de Vratenín ao cemitério. O pavimento será separado da estrada por um passeio ou cinturão verde. A largura do pavimento é projetada no valor de 1,50-3,00 m. A superfície será feita de pavimentação de concreto de cimento com camadas de base não fundidas. Para ligar a calçada ao percurso pedonal existente, propõe-se um ponto d...

7 March 2024

15 January 2024

12 June 2023

17 February 2023

24 July 2022

  • curprev 15:2515:25, 24 July 2022DG Regio talk contribs 47,516 bytes +27,878 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

28 November 2021

  • curprev 23:3123:31, 28 November 2021DG Regio talk contribs 13,443 bytes +1,408 Created claim: summary (P836): L’objet du projet consiste en un nouveau bâtiment de la route piétonne manquante le long de la route III/40928 reliant le village de Vratenín au cimetière. Le trottoir sera séparé de la route par un trottoir ou une ceinture verte. La largeur de la chaussée est conçue dans la valeur de 1,50-3,00 m. La surface sera faite de revêtement en béton cimento avec des couches souterraines non moulées. Pour relier le trottoir à la route piétonne existante,...
  • curprev 23:3123:31, 28 November 2021DG Regio talk contribs 12,035 bytes +115 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 18:0218:02, 23 October 2020DG Regio talk contribs 12,369 bytes +115 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:0218:02, 23 October 2020DG Regio talk contribs 12,254 bytes −105 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:0218:02, 23 October 2020DG Regio talk contribs 12,359 bytes +1,378 Created claim: summary (P836): The object of the project lies in the new construction of the missing pedestrian route along the road III/40928 connecting the village Vratenín with the cemetery. The pavement will be separated from the road by a curb or green belt. The width of the pavement is designed in the value of 1.50-3.00 m. The surface will be made of cement concrete paving with base unmelted layers. For connecting the sidewalk to the existing pedestrian route, one point...
  • curprev 18:0218:02, 23 October 2020DG Regio talk contribs 10,981 bytes −825 Removed claim: summary (P836): The purpose of the project lies in the new construction of the missing walkway along communication III/40928 linking the municipality of Vrachnun. The walkway shall be separated from the ground by a road bypass or green band. The width of the walkway shall be 1,50-3.00 m. One place for crossing is proposed for the connection of a pedestrian to an existing walkway route. The implementation of the project will ensure the safety and flow of trans...

24 September 2020

21 September 2020

31 August 2020

28 August 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 11:3611:36, 26 February 2020DG Regio talk contribs 10,030 bytes +825 Created claim: summary (P836): The purpose of the project lies in the new construction of the missing walkway along communication III/40928 linking the municipality of Vrachnun. The walkway shall be separated from the ground by a road bypass or green band. The width of the walkway shall be 1,50-3.00 m. One place for crossing is proposed for the connection of a pedestrian to an existing walkway route. The implementation of the project will ensure the safety and flow of transpo...

17 February 2020

6 February 2020

30 January 2020

28 January 2020

11 January 2020