Revision history of "Solution of cycling transport Pomezí nad Ohří" (Q63783)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 11:2411:24, 12 October 2024DG Regio talk contribs 50,388 bytes +1 Changed label, description and/or aliases in pt
  • curprev 11:2411:24, 12 October 2024DG Regio talk contribs 50,387 bytes −10 Set a claim value: summary (P836): Os principais objetivos do projeto são aumentar a segurança, otimizar a disponibilidade e os serviços de transporte nos locais afetados. O projeto garantirá a circulação segura do trabalho, dos serviços e das escolas de todos os grupos-alvo, bem como uma passagem harmoniosa e segura pelos municípios. É proposta uma nova plantação de vegetação no âmbito do projeto (por exemplo, uma faixa verde que se divide entre a ciclovia e o solo, a plantação de n...

22 March 2024

15 January 2024

6 July 2023

19 June 2023

12 June 2023

20 February 2023

17 February 2023

24 July 2022

  • curprev 15:0715:07, 24 July 2022DG Regio talk contribs 47,674 bytes +28,076 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

28 November 2021

  • curprev 23:3223:32, 28 November 2021DG Regio talk contribs 13,460 bytes +1,443 Created claim: summary (P836): Les principaux objectifs du projet sont d’accroître la sécurité, d’optimiser l’accessibilité et les services de transport sur les sites concernés. Le projet assurera un transfert sûr pour le travail, les services et les écoles de tous les groupes cibles et assurera également un passage en douceur et en toute sécurité des municipalités. Le projet propose une nouvelle plantation de verdure (par exemple, diviser la bande verte entre la piste cycla...
  • curprev 23:3223:32, 28 November 2021DG Regio talk contribs 12,017 bytes +114 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 14:0214:02, 23 October 2020DG Regio talk contribs 12,352 bytes +107 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:0214:02, 23 October 2020DG Regio talk contribs 12,245 bytes −102 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:0214:02, 23 October 2020DG Regio talk contribs 12,347 bytes +1,370 Created claim: summary (P836): The main objectives of the project are increasing safety, optimising availability and transport services in the affected locations. The project will ensure safe movement for work, services and schools of all target groups, and will also ensure a smooth and safe passage through the municipalities. A new planting of greenery is proposed as part of the project (e.g. a green strip dividing between the bike path and the ground, planting new trees)....
  • curprev 14:0214:02, 23 October 2020DG Regio talk contribs 10,977 bytes −896 Removed claim: summary (P836): The main objectives of the project are to increase safety, to optimise the availability and connectivity of the sites concerned. The project will ensure the safe transfer of works, services and schools of all target groups, also ensuring the smooth and safe passage of municipalities. A new planting of green (e.g. a green separator between cycle paths and road, planting of new trees) is proposed as part of the project. The project fulfils the...

24 September 2020

21 September 2020

31 August 2020

28 August 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 11:3511:35, 26 February 2020DG Regio talk contribs 10,087 bytes +896 Created claim: summary (P836): The main objectives of the project are to increase safety, to optimise the availability and connectivity of the sites concerned. The project will ensure the safe transfer of works, services and schools of all target groups, also ensuring the smooth and safe passage of municipalities. A new planting of green (e.g. a green separator between cycle paths and road, planting of new trees) is proposed as part of the project. The project fulfils the sp...

17 February 2020

6 February 2020

30 January 2020

28 January 2020

11 January 2020