Revision history of "Improving traffic conditions in the city of Hroznětín" (Q63648)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 20:4620:46, 12 October 2024DG Regio talk contribs 47,226 bytes −1 Changed label, description and/or aliases in pt
  • curprev 20:4620:46, 12 October 2024DG Regio talk contribs 47,227 bytes +7 Set a claim value: summary (P836): O projeto tem por objeto a construção de calçadas na cidade de Hroznětín, na parte a leste de Krušnohorský náměstí, ao longo da rua Ostrovská, até ao final da cidade em direção à aldeia de Bystřice, adaptada a pessoas com mobilidade reduzida. Atualmente, o projeto trata da inexistência de infraestruturas pedonais. A rota também inclui 2 baías de autocarros e dois pontos de passagem.

12 March 2024

15 January 2024

12 June 2023

17 February 2023

24 July 2022

  • curprev 14:4714:47, 24 July 2022DG Regio talk contribs 44,548 bytes +25,063 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

28 November 2021

  • curprev 23:3323:33, 28 November 2021DG Regio talk contribs 14,059 bytes +1,244 Created claim: summary (P836): L’objet du projet est la construction de trottoirs dans la ville de Hroznětín, dans une partie à l’est de Krušnohorské náměstí, le long de la rue Ostrovská, jusqu’à la fin de la ville en direction du village Bystřice, adapté aux personnes à mobilité réduite. Actuellement, le projet porte sur une infrastructure piétonne inexistante. Sur la route, il y a aussi 2 baies de bus et deux points de passage., translated_summary
  • curprev 23:3323:33, 28 November 2021DG Regio talk contribs 12,815 bytes +117 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 13:4913:49, 23 October 2020DG Regio talk contribs 13,147 bytes +114 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 13:4913:49, 23 October 2020DG Regio talk contribs 13,033 bytes −122 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 13:4913:49, 23 October 2020DG Regio talk contribs 13,155 bytes +1,222 Created claim: summary (P836): The object of the project is the construction of sidewalks in the town of Hroznětín, in the part east of Krušnohorský náměstí, along Ostrovská Street, until the end of the town in the direction of the village Bystřice, adapted to persons with reduced mobility. The project currently deals with non-existent pedestrian infrastructure. The route also includes 2 bus bays and two crossing points., translated_summary
  • curprev 13:4913:49, 23 October 2020DG Regio talk contribs 11,933 bytes −805 Removed claim: summary (P836): The project involves the construction of pavements in the town of Hroznětín, in a part of the East of the Ore Square, along the island of Ostrovets, until the end of the town in the direction of the municipality of Bystřice, adapted to persons with reduced mobility. At present, the project deals with non-existent pedestrian infrastructure. In addition, 2 bus inlets and two types of crossing points are proposed along the route., remove_old_engl...

24 September 2020

21 September 2020

31 August 2020

28 August 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 11:1911:19, 26 February 2020DG Regio talk contribs 10,953 bytes +805 Created claim: summary (P836): The project involves the construction of pavements in the town of Hroznětín, in a part of the East of the Ore Square, along the island of Ostrovets, until the end of the town in the direction of the municipality of Bystřice, adapted to persons with reduced mobility. At present, the project deals with non-existent pedestrian infrastructure. In addition, 2 bus inlets and two types of crossing points are proposed along the route., Adding English su...

17 February 2020

6 February 2020

30 January 2020

28 January 2020

11 January 2020