Revision history of "Remediation and revitalisation of the Great Chuchle landfill" (Q63394)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 08:4008:40, 13 October 2024DG Regio talk contribs 52,761 bytes +1 Changed label, description and/or aliases in pt
  • curprev 08:4008:40, 13 October 2024DG Regio talk contribs 52,760 bytes +15 Set a claim value: summary (P836): O antigo aterro TKO Slivenec está localizado na parte SZ da cidade de Praga e esteve em funcionamento em 1962-1986. Posteriormente, a inclinação foi estabilizada por uma parede amarrada, sobrepondo-se a superfície do aterro com uma potência de 0,5 m e semeando a superfície com grama. Quando o aterro foi coberto, as condições de drenagem natural necessárias não foram cumpridas e a consolidação a longo prazo do corpo do aterro não foi tida em conta ap...

7 March 2024

15 January 2024

22 December 2023

12 June 2023

17 February 2023

24 July 2022

  • curprev 14:1114:11, 24 July 2022DG Regio talk contribs 49,041 bytes +28,891 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

13 December 2021

2 December 2021

28 November 2021

  • curprev 23:2623:26, 28 November 2021DG Regio talk contribs 14,512 bytes +1,549 Created claim: summary (P836): L’ancienne décharge de TKO Slivenec est située dans la partie sud-ouest de la ville de Prague et a été exploitée entre 1962 et 1986. Par la suite, la pente a été stabilisée à l’aide d’un mur ancré, superposée à la surface du site d’enfouissement d’une puissance de 0,5 m et semée d’herbe. Lorsque la décharge a été couverte, les conditions de captage nécessaires pour les effluents d’eau naturel n’étaient pas remplies et la consolidation à long ter...
  • curprev 23:2623:26, 28 November 2021DG Regio talk contribs 12,963 bytes +115 Changed label, description and/or aliases in fr: translated_label

29 October 2020

23 October 2020

  • curprev 13:2113:21, 23 October 2020DG Regio talk contribs 13,293 bytes +119 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 13:2113:21, 23 October 2020DG Regio talk contribs 13,174 bytes −114 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 13:2113:21, 23 October 2020DG Regio talk contribs 13,288 bytes +1,407 Created claim: summary (P836): The former landfill TKO Slivenec is located in the SZ part of the City of Prague and was in operation in 1962-1986. Subsequently, the slope was stabilised by a moored wall, overlapping the surface of the landfill with a power of 0.5 m and sowing the surface with grass. When the landfill was covered, the necessary natural drainage conditions were not met and the long-term consolidation of the landfill body was not taken into account after the fin...
  • curprev 13:2113:21, 23 October 2020DG Regio talk contribs 11,881 bytes −1,004 Removed claim: summary (P836): The former TKO Slivenec site is located in the JZ of a part of the City of Prague and was in operation in 1962-1986. This was followed by a stabilisation of the slope of the anchor wall, an overlap of the surface of the landfill of soil with a power of 0.5 m and the area of the surface of grass. When sealing the landfill site, the necessary catchment conditions for natural water run-off have not been met and the long-term consolidation of the...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 12:1512:15, 26 February 2020DG Regio talk contribs 11,222 bytes +1,004 Created claim: summary (P836): The former TKO Slivenec site is located in the JZ of a part of the City of Prague and was in operation in 1962-1986. This was followed by a stabilisation of the slope of the anchor wall, an overlap of the surface of the landfill of soil with a power of 0.5 m and the area of the surface of grass. When sealing the landfill site, the necessary catchment conditions for natural water run-off have not been met and the long-term consolidation of the la...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020