Revision history of "Composting plant – nade s.r.o." (Q63344)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 11:2411:24, 12 October 2024DG Regio talk contribs 51,018 bytes +1 Changed label, description and/or aliases in pt
  • curprev 11:2411:24, 12 October 2024DG Regio talk contribs 51,017 bytes −8 Set a claim value: summary (P836): O objetivo do projeto é a aquisição de tecnologia para garantir a compostagem livre em estacas. O resultado esperado será assegurar a valorização material dos resíduos. A capacidade total da central após a conclusão do projeto será de 1 500 toneladas de resíduos biodegradáveis (BRO), destinando-se o projeto à construção de uma nova central de compostagem com uma capacidade de 1 500 toneladas, das quais toda a capacidade da central de compostagem ser...

23 March 2024

15 January 2024

12 June 2023

17 February 2023

24 July 2022

  • curprev 14:0414:04, 24 July 2022DG Regio talk contribs 48,353 bytes +27,860 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

28 November 2021

  • curprev 23:2723:27, 28 November 2021DG Regio talk contribs 14,379 bytes +1,416 Created claim: summary (P836): L’objet du projet est l’acquisition de technologies pour assurer le compostage librement sur les pieux. Le résultat escompté sera d’assurer la valorisation matérielle des déchets. La capacité totale de l’usine après l’achèvement du projet sera de 1 500 tonnes de déchets biodégradables (BRO), le projet vise à construire une nouvelle usine de compost d’une capacité de 1500 tonnes, dont la totalité de la capacité de l’usine de compost sera constitu...
  • curprev 23:2723:27, 28 November 2021DG Regio talk contribs 12,963 bytes +91 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 13:1913:19, 23 October 2020DG Regio talk contribs 13,321 bytes +91 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 13:1913:19, 23 October 2020DG Regio talk contribs 13,230 bytes −84 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 13:1913:19, 23 October 2020DG Regio talk contribs 13,314 bytes +1,347 Created claim: summary (P836): The object of the project is the acquisition of technology to ensure composting freely in piles. The expected result will be to ensure the material recovery of waste. The total capacity of the plant after the completion of the project will be 1,500 tonnes of biodegradable waste (BRO), the project is aimed at building a new compost plant with a capacity of 1 500 tonnes, of which the entire composting plant capacity will be BRKO (biodegradable mun...
  • curprev 13:1913:19, 23 October 2020DG Regio talk contribs 11,967 bytes −922 Removed claim: summary (P836): The subject of the project is the acquisition of the technology to ensure the collection of the composting plant. The expected result will be the collection of material recovery of waste. The total capacity of the plant after the completion of the project will be 1 500 tonnes of biodegradable waste (BRO), the project is aimed at the construction of a new 1 500 tons of compost, of which the total capacity of the composting plant will constitute...

17 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 12:1412:14, 26 February 2020DG Regio talk contribs 11,598 bytes +922 Created claim: summary (P836): The subject of the project is the acquisition of the technology to ensure the collection of the composting plant. The expected result will be the collection of material recovery of waste. The total capacity of the plant after the completion of the project will be 1 500 tonnes of biodegradable waste (BRO), the project is aimed at the construction of a new 1 500 tons of compost, of which the total capacity of the composting plant will constitute B...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020