Revision history of "Composting plant – Chotíkov u Kynšperka nad Ohří" (Q63328)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 11:2411:24, 12 October 2024DG Regio talk contribs 50,830 bytes +11 Changed label, description and/or aliases in pt
  • curprev 11:2411:24, 12 October 2024DG Regio talk contribs 50,819 bytes +3 Set a claim value: summary (P836): O projeto irá adquirir uma técnica que será utilizada na compostagem para a utilização de materiais de resíduos – a construção da Kompostárna – Chotíkov u Kynšperka nad Ohří. A unidade de compostagem será explorada de acordo com a Lei n.o 185/2001 Coll., relativa aos resíduos. A capacidade da estação de compostagem será de 700 toneladas com o tratamento de resíduos urbanos, cuja quota será de, pelo menos, 50 %. A compostagem será feita nos sacos. O...

7 March 2024

15 January 2024

12 June 2023

17 February 2023

24 July 2022

  • curprev 14:0114:01, 24 July 2022DG Regio talk contribs 47,632 bytes +27,697 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

28 November 2021

  • curprev 23:2723:27, 28 November 2021DG Regio talk contribs 13,889 bytes +1,414 Created claim: summary (P836): Le projet va acquérir une technique qui sera utilisée pour le compostage pour la récupération des matériaux des déchets — construction d’une usine de compostage — Chotíkov u Kynšperka nad Ohří. L’usine de compost sera exploitée conformément à la loi no 185/2001 sur les déchets. La capacité de l’usine de compost sera de 700 tonnes avec le traitement des déchets municipaux, dont la part sera d’au moins 50 %. Le compostage aura lieu dans des sacs....
  • curprev 23:2723:27, 28 November 2021DG Regio talk contribs 12,475 bytes +109 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 13:1913:19, 23 October 2020DG Regio talk contribs 12,815 bytes +113 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 13:1913:19, 23 October 2020DG Regio talk contribs 12,702 bytes −120 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 13:1913:19, 23 October 2020DG Regio talk contribs 12,822 bytes +1,355 Created claim: summary (P836): The project will acquire a technique that will be used for composting for material use of waste – the construction of the Kompostárna – Chotíkov u Kynšperka nad Ohří. The composting plant will be operated according to Act No. 185/2001 Coll., on Wastes. The capacity of the compost plant will be 700 tonnes with the treatment of municipal waste, the share of which will be at least 50 %. Composting will take place in the bags. The place of realisati...
  • curprev 13:1913:19, 23 October 2020DG Regio talk contribs 11,467 bytes −881 Removed claim: summary (P836): The project involves the acquisition of the technique to be used for the use of composting for the use of waste — the establishment of an ageing plant — Chotíkov, with Kynjek nad Ohří. The Association will be operated in accordance with Act No 185/2001 on waste. The capacity of composting plants will be 700 tonnes with a municipal waste treatment of at least 50 %. The composting process will take place in bags. The place of production is 145 i...

17 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 12:1412:14, 26 February 2020DG Regio talk contribs 11,057 bytes +881 Created claim: summary (P836): The project involves the acquisition of the technique to be used for the use of composting for the use of waste — the establishment of an ageing plant — Chotíkov, with Kynjek nad Ohří. The Association will be operated in accordance with Act No 185/2001 on waste. The capacity of composting plants will be 700 tonnes with a municipal waste treatment of at least 50 %. The composting process will take place in bags. The place of production is 145 in...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020