Revision history of "Střelice – reconstruction of sidewalks on Antonín Smutný Street – Stage II" (Q63291)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

22 December 2023

19 June 2023

12 June 2023

17 February 2023

24 July 2022

  • curprev 13:5613:56, 24 July 2022DG Regio talk contribs 49,217 bytes +28,436 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

28 November 2021

  • curprev 23:2623:26, 28 November 2021DG Regio talk contribs 14,590 bytes +1,453 Created claim: summary (P836): Il s’agit d’une reconstruction de la route piétonne le long de la route de troisième classe sur la rue Antonína Smutný dans le village de Střelice, y compris des éléments connexes améliorant la sécurité des piétons tels que la construction d’un passage pour piétons, de trois points de passage, de pavage des aires d’embarquement des arrêts de transports publics, de construction d’éclairage public et d’herbement des environs immédiatement autour d...
  • curprev 23:2623:26, 28 November 2021DG Regio talk contribs 13,137 bytes +142 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 13:1813:18, 23 October 2020DG Regio talk contribs 13,444 bytes +140 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 13:1813:18, 23 October 2020DG Regio talk contribs 13,304 bytes −137 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 13:1813:18, 23 October 2020DG Regio talk contribs 13,441 bytes +1,363 Created claim: summary (P836): It is a reconstruction of the pedestrian road along the third class road on Antonín Smutný Street in the village Střelice, including related elements increasing the safety of pedestrian traffic, such as building one pedestrian crossing, three crossing points, pre-bailing of boarding areas of public public transport stops, construction of public lighting and grassing the surrounding area immediately around the road. The aim of the project is to i...
  • curprev 13:1813:18, 23 October 2020DG Regio talk contribs 12,078 bytes −903 Removed claim: summary (P836): It is a reconstruction of road safety communication along road III road to Antonona Smutná, in the municipality of Střelice, including related elements improving pedestrian safety, three pedestrian crossings, three places for crossing, forestalling of succession areas of public transport stops, construction of public lighting and the grassing of the surrounding area immediately around the roads. The aim of the project is to increase the safety...

31 August 2020

28 August 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 12:1312:13, 26 February 2020DG Regio talk contribs 11,178 bytes +903 Created claim: summary (P836): It is a reconstruction of road safety communication along road III road to Antonona Smutná, in the municipality of Střelice, including related elements improving pedestrian safety, three pedestrian crossings, three places for crossing, forestalling of succession areas of public transport stops, construction of public lighting and the grassing of the surrounding area immediately around the roads. The aim of the project is to increase the safety o...

17 February 2020

6 February 2020

30 January 2020

28 January 2020

11 January 2020