Revision history of "Sidewalks in the village of Okřešice" (Q63251)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 23:1323:13, 12 October 2024DG Regio talk contribs 51,291 bytes +7 Set a claim value: summary (P836): O projeto envolve a construção de um troço de um novo pavimento ao longo da estrada III/35112, com 169 m de comprimento, que ligará ao percurso pedonal já concluído ao longo de todo o comprimento da aldeia em torno da estrada de 3a classe perto da igreja. O pavimento será ligado a todo o percurso por um ponto de passagem. A sua aplicação numa norma sem barreiras, incluindo outros dispositivos de segurança (caminhos de ferro), permite uma circulação...

7 March 2024

15 January 2024

12 June 2023

17 February 2023

24 July 2022

  • curprev 13:4913:49, 24 July 2022DG Regio talk contribs 48,614 bytes +27,923 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

28 November 2021

  • curprev 23:2623:26, 28 November 2021DG Regio talk contribs 14,473 bytes +1,485 Created claim: summary (P836): Le projet comprend la construction d’une section d’un nouveau trottoir le long de la route III/35112, d’une longueur de 169 m, qui reliera près de l’église à la route piétonne déjà achevée le long de toute la longueur du village le long de la route de 3ème classe. Le trottoir sera relié à l’ensemble de la route par un point de passage. Sa mise en œuvre dans une norme sans obstacles, y compris d’autres dispositifs de sécurité (rail), facilitera e...
  • curprev 23:2623:26, 28 November 2021DG Regio talk contribs 12,988 bytes +95 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 13:1713:17, 23 October 2020DG Regio talk contribs 13,342 bytes +97 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 13:1713:17, 23 October 2020DG Regio talk contribs 13,245 bytes −80 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 13:1713:17, 23 October 2020DG Regio talk contribs 13,325 bytes +1,362 Created claim: summary (P836): The project involves building a section of a new pavement along road III/35112, 169 m long, which will connect to the already completed pedestrian route along the entire length of the village around the 3rd class road near the church. The pavement will be connected to the entire route by a crossing point. Its implementation in a barrier-free standard, including other safety features (railing) allows easier and safer movement of pedestrians aroun...
  • curprev 13:1713:17, 23 October 2020DG Regio talk contribs 11,963 bytes −952 Removed claim: summary (P836): The project involves the construction of a section of a new walkway along the III/35112 road, with a length of 169 m, which, near the church, links to an already done pedestrian route along the whole length of the municipality around the 3 rd class road. The walkway will be connected to the crossing point in the whole route. Its implementation in a barrier-free standard, including other safety features (handrails), will allow for easier and sa...

21 September 2020

31 August 2020

28 August 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 12:1312:13, 26 February 2020DG Regio talk contribs 11,114 bytes +952 Created claim: summary (P836): The project involves the construction of a section of a new walkway along the III/35112 road, with a length of 169 m, which, near the church, links to an already done pedestrian route along the whole length of the municipality around the 3 rd class road. The walkway will be connected to the crossing point in the whole route. Its implementation in a barrier-free standard, including other safety features (handrails), will allow for easier and safe...

17 February 2020

6 February 2020

30 January 2020

28 January 2020

11 January 2020