Revision history of "Pavement along the way through the villages of Petroupim and Petroupec" (Q63132)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 20:4520:45, 12 October 2024DG Regio talk contribs 50,338 bytes −2 Changed label, description and/or aliases in pt
  • curprev 20:4520:45, 12 October 2024DG Regio talk contribs 50,340 bytes −13 Set a claim value: summary (P836): Construção de calçadas ao longo da passagem através das partes locais de Petroupi e Petroupec ao longo da estrada III/1102. A construção inclui a reconstrução das calçadas existentes e a construção de novas colinas, na medida do necessário. A calçada leva a uma paragem de transportes públicos e será adaptada para pessoas com mobilidade reduzida. Reconstrução da iluminação pública acima do comprimento do pavimento. Uma nova plataforma de autocarros s...

12 March 2024

15 January 2024

6 July 2023

12 June 2023

17 February 2023

24 July 2022

  • curprev 13:3113:31, 24 July 2022DG Regio talk contribs 46,137 bytes +26,909 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 22:0822:08, 2 December 2021DG Regio talk contribs 14,780 bytes +1,345 Created claim: summary (P836): Bau von Pflastern entlang der Riegel durch die lokalen Teile von Petroupim und Petroupec entlang der Straße III/1102. Der Bau umfasst den Wiederaufbau bestehender Gehsteige und den Bau neuer, soweit notwendiger Anschluss von Abfahrten. Der Bürgersteig führt zu einer Haltestelle des öffentlichen Verkehrs und wird für Personen mit eingeschränkter Mobilität angepasst. Rekonstruktion der öffentlichen Beleuchtung über die gesamte Länge des Bürgerstei...
  • curprev 22:0822:08, 2 December 2021DG Regio talk contribs 13,435 bytes +134 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 23:2423:24, 28 November 2021DG Regio talk contribs 13,301 bytes +1,376 Created claim: summary (P836): Construction de trottoirs le long du loquet à travers les parties locales de Petroupim et Petroupec le long de la route III/1102. La construction comprend la reconstruction des chaussées existantes et la construction de nouvelles, dans la mesure où cela est nécessaire pour relier les descentes. Le trottoir mène à un arrêt des transports en commun et sera adapté aux personnes à mobilité réduite. Reconstruction de l’éclairage public sur toute la l...
  • curprev 23:2423:24, 28 November 2021DG Regio talk contribs 11,925 bytes +132 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 17:5017:50, 23 October 2020DG Regio talk contribs 12,242 bytes +129 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:5017:50, 23 October 2020DG Regio talk contribs 12,113 bytes −111 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:5017:50, 23 October 2020DG Regio talk contribs 12,224 bytes +1,296 Created claim: summary (P836): Construction of sidewalks along the passageway through the local parts of Petroupi and Petroupec along the road III/1102. The construction includes reconstruction of existing sidewalks and construction of new, to the extent necessary follow-up downhills. The sidewalk leads to a public transport stop and will be adapted for persons with reduced mobility. Reconstruction of public lighting above the length of the pavement. A new bus platform will b...
  • curprev 17:5017:50, 23 October 2020DG Regio talk contribs 10,928 bytes −841 Removed claim: summary (P836): Walking corridor construction along the passage through the local parts of Petroupi and Petroupec along the III/1102 road. The construction includes the reconstruction of existing corridors and the construction of new ones, in the necessary degree of follow up. The pavement leads to public transport and will be adapted for persons with reduced mobility. Reconstruction of public lighting over the entire length of a walkway. The project will bui...

31 August 2020

28 August 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 11:5911:59, 26 February 2020DG Regio talk contribs 9,967 bytes +841 Created claim: summary (P836): Walking corridor construction along the passage through the local parts of Petroupi and Petroupec along the III/1102 road. The construction includes the reconstruction of existing corridors and the construction of new ones, in the necessary degree of follow up. The pavement leads to public transport and will be adapted for persons with reduced mobility. Reconstruction of public lighting over the entire length of a walkway. The project will build...

17 February 2020

6 February 2020

30 January 2020

28 January 2020

11 January 2020