Revision history of "Addition of systems for separate collection of waste in the collection yard of the city of Protivín" (Q63105)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 20:4520:45, 12 October 2024DG Regio talk contribs 52,886 bytes −4 Changed label, description and/or aliases in pt
  • curprev 20:4520:45, 12 October 2024DG Regio talk contribs 52,890 bytes −14 Set a claim value: summary (P836): O objetivo do projeto é preparar a execução do plano de gestão de resíduos 2013-2020, em função da diretiva da UE em vigor, tendo simultaneamente em conta a legislação em vigor e as possibilidades e obrigações dela decorrentes. Especificamente, a aquisição de novos recipientes, mais volumosos = 20 peças, a fim de aumentar a capacidade do pátio de coleta existente na cidade de Protivín. O parque de recolha é utilizado para armazenar resíduos produzid...

7 March 2024

15 January 2024

22 December 2023

6 July 2023

12 June 2023

17 February 2023

24 July 2022

  • curprev 13:2613:26, 24 July 2022DG Regio talk contribs 49,200 bytes +28,941 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 22:0722:07, 2 December 2021DG Regio talk contribs 15,607 bytes +1,375 Created claim: summary (P836): Ziel des Projekts ist es, die Umsetzung des Abfallbewirtschaftungsplans 2013-2020 entsprechend der geltenden EU-Richtlinie unter Berücksichtigung der geltenden Rechtsvorschriften und der sich daraus ergebenden Möglichkeiten und Verpflichtungen vorzubereiten. Insbesondere der Erwerb von neuen, mehr sperrigen Containern = 20 Stück, um die Kapazität von der bestehenden Sammelstelle in Protivín zu erhöhen. Die Sammelstelle dient der Beseitigung von...
  • curprev 22:0722:07, 2 December 2021DG Regio talk contribs 14,232 bytes +134 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 23:2423:24, 28 November 2021DG Regio talk contribs 14,098 bytes +1,431 Created claim: summary (P836): L’objectif du projet est de préparer la mise en œuvre du plan de gestion des déchets 2013-2020, en fonction de la directive existante de l’UE, tout en tenant compte de la législation en vigueur et des possibilités et obligations qui en découlent. Plus précisément, l’acquisition de nouveaux conteneurs plus volumineux = 20 pièces, afin d’augmenter la capacité du chantier de collecte existant à Protivín. Le parc de collecte est utilisé pour l’élimi...
  • curprev 23:2423:24, 28 November 2021DG Regio talk contribs 12,667 bytes +162 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 12:5612:56, 23 October 2020DG Regio talk contribs 12,954 bytes +160 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:5612:56, 23 October 2020DG Regio talk contribs 12,794 bytes −157 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:5612:56, 23 October 2020DG Regio talk contribs 12,951 bytes +1,358 Created claim: summary (P836): The aim of the project is to be prepared for the implementation of the waste management plan 2013-2020 depending on the existing EU directive, while taking into account the current legislation and the possibilities and obligations arising from it. Specifically, the acquisition of new, more bulky containers = 20 pieces, in order to increase the capacity of the existing collection yard in the city of Protivín. The collection yard is used to store...
  • curprev 12:5612:56, 23 October 2020DG Regio talk contribs 11,593 bytes −937 Removed claim: summary (P836): The project aims at preparing for the implementation of the waste management plan 2013-2020, depending on the existing EU directive, while taking into account the current legislation and the possibilities and obligations stemming from it. In particular, it concerns the acquisition of new, more large containers = 20 pieces, in order to increase the capacity of the current Court of Drugs in the city of Protivin. The collection of waste is for th...

17 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 12:0312:03, 26 February 2020DG Regio talk contribs 11,239 bytes +937 Created claim: summary (P836): The project aims at preparing for the implementation of the waste management plan 2013-2020, depending on the existing EU directive, while taking into account the current legislation and the possibilities and obligations stemming from it. In particular, it concerns the acquisition of new, more large containers = 20 pieces, in order to increase the capacity of the current Court of Drugs in the city of Protivin. The collection of waste is for the...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020