Revision history of "Polešovice – walkways of Školní Street, II. Stage" (Q63008)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 11:2111:21, 12 October 2024DG Regio talk contribs 50,042 bytes +1 Changed label, description and/or aliases in pt
  • curprev 11:2111:21, 12 October 2024DG Regio talk contribs 50,041 bytes −4 Set a claim value: summary (P836): O objetivo do projeto é a reconstrução das calçadas existentes e as obras de construção da estrada local. Dentro da construção, a largura do pavimento é projetada para um valor mínimo de 1,50 m e uma nova superfície feita de pavimentação de concreto. No total, serão reconstruídas calçadas com 320,2 m de comprimento e uma área de 480,3 m2. A prioridade da construção é garantir a ligação segura das vias de comunicação para os peões na estrada de acess...

7 March 2024

15 January 2024

22 December 2023

12 June 2023

17 February 2023

24 July 2022

  • curprev 13:1013:10, 24 July 2022DG Regio talk contribs 46,855 bytes +26,618 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 22:0122:01, 2 December 2021DG Regio talk contribs 15,770 bytes +1,349 Created claim: summary (P836): Gegenstand des Projekts ist der Wiederaufbau vorhandener Gehwege und die von ihnen verursachten Bauänderungen der lokalen Straße. Im Rahmen der Konstruktion sind die Breitenanpassung des Gehsteigs auf einen Mindestwert von 1,50 m und eine neue Oberfläche aus Betonpflaster ausgelegt. Insgesamt werden Bürgersteige von 320,2 m und eine Fläche von 480,3 m² rekonstruiert. Priorität des Baus ist die Gewährleistung einer sicheren Anbindung von Kommunik...
  • curprev 22:0122:01, 2 December 2021DG Regio talk contribs 14,421 bytes +115 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 23:2023:20, 28 November 2021DG Regio talk contribs 14,306 bytes +1,391 Created claim: summary (P836): L’objet du projet est la reconstruction des chaussées existantes et les modifications de construction de la route locale causées par ceux-ci. Dans le cadre de la construction, le réglage de la largeur de la chaussée à une valeur minimale de 1,50 m et une nouvelle surface en pavage en béton sont conçus. Au total, des chaussées de 320,2 m et une superficie de 480,3 m² seront reconstruites. La priorité de la construction est d’assurer une connexion...
  • curprev 23:2023:20, 28 November 2021DG Regio talk contribs 12,915 bytes +115 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 18:0618:06, 23 October 2020DG Regio talk contribs 13,249 bytes +113 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:0618:06, 23 October 2020DG Regio talk contribs 13,136 bytes −144 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:0618:06, 23 October 2020DG Regio talk contribs 13,280 bytes +1,310 Created claim: summary (P836): The object of the project is the reconstruction of existing sidewalks and the construction works of the local road. Within the construction, the width of the pavement is designed to a minimum value of 1.50 m and a new surface made of concrete lock paving. In total, sidewalks in length of 320.2 m and an area of 480.3 m² will be reconstructed. The priority of the construction is to ensure secure connection of communication routes for pedestrians o...
  • curprev 18:0618:06, 23 October 2020DG Regio talk contribs 11,970 bytes −811 Removed claim: summary (P836): The project involves the reconstruction of existing pavements and the ensuing development of local roads. As part of a construction work, a 1.50 m minimum width of the walkway and a new surface made of concrete captions would be made. The total of 320.2 m and 480.3 m² will be rebuilt. The priority of building is to ensure that communication routes are securely connected to a primary school on the path of access to a primary school., remove_old...

21 September 2020

31 August 2020

28 August 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 11:4611:46, 26 February 2020DG Regio talk contribs 10,988 bytes +811 Created claim: summary (P836): The project involves the reconstruction of existing pavements and the ensuing development of local roads. As part of a construction work, a 1.50 m minimum width of the walkway and a new surface made of concrete captions would be made. The total of 320.2 m and 480.3 m² will be rebuilt. The priority of building is to ensure that communication routes are securely connected to a primary school on the path of access to a primary school., Adding Engli...

17 February 2020

6 February 2020

30 January 2020

28 January 2020

11 January 2020