Revision history of "Barrier-free walkway direction Soláň along road II/481 – stage I" (Q62981)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 08:4008:40, 13 October 2024DG Regio talk contribs 48,621 bytes +5 Changed label, description and/or aliases in pt
  • curprev 08:4008:40, 13 October 2024DG Regio talk contribs 48,616 bytes −1 Set a claim value: summary (P836): O projeto visa aumentar a segurança dos transportes na aldeia de Hutisko – Solanec. Este objetivo será alcançado através da construção de uma calçada sem barreiras ao longo da estrada da classe II. (II/481), que é uma estrada prioritária na região de Zlín. A calçada será adaptada às pessoas com mobilidade reduzida. A construção do pavimento resultará numa melhor ligação ao centro da aldeia a partir da direção de Soláně, praticamente Zákopčí

23 March 2024

15 January 2024

12 June 2023

17 February 2023

24 July 2022

  • curprev 13:0213:02, 24 July 2022DG Regio talk contribs 45,945 bytes +25,969 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 22:0022:00, 2 December 2021DG Regio talk contribs 15,662 bytes +1,282 Created claim: summary (P836): Das Projekt befasst sich mit erhöhter Verkehrssicherheit in der Gemeinde Hutisko – Solanec. Dieses Ziel wird durch den Bau eines barrierefreien Gehwegs entlang der Straße II. Klasse II (II/481), die eine vorrangige Straße in der Region Zlín ist, erreicht. Der Bürgersteig wird an Personen mit eingeschränkter Mobilität angepasst. Der Bau des Pflasters führt zu einer besseren Verbindung zum Zentrum des Dorfes aus Richtung Soláň, praktisch Zákopčí,...
  • curprev 22:0022:00, 2 December 2021DG Regio talk contribs 14,380 bytes +137 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 23:1923:19, 28 November 2021DG Regio talk contribs 14,243 bytes +1,320 Created claim: summary (P836): Le projet porte sur l’amélioration de la sécurité des transports dans la municipalité de Hutisko — Solanec. Cet objectif sera atteint par la construction d’un trottoir sans barrières le long de la route II. classe II (II/481), qui est une route prioritaire dans la région de Zlín. Le trottoir sera adapté aux personnes à mobilité réduite. La construction du trottoir se traduira par une meilleure connexion au centre du village depuis la direction d...
  • curprev 23:1923:19, 28 November 2021DG Regio talk contribs 12,923 bytes +135 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 13:1313:13, 23 October 2020DG Regio talk contribs 13,237 bytes +127 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 13:1313:13, 23 October 2020DG Regio talk contribs 13,110 bytes −112 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 13:1313:13, 23 October 2020DG Regio talk contribs 13,222 bytes +1,283 Created claim: summary (P836): The project deals with increased transport safety in the village Hutisko – Solanec. This objective will be achieved through the construction of a barrier-free sidewalk along the II. class road (II/481), which is a priority road in the Zlín Region. The sidewalk will be adapted to persons with reduced mobility. The construction of the pavement will result in a better connection to the centre of the village from the direction of Soláně, virtually Z...
  • curprev 13:1313:13, 23 October 2020DG Regio talk contribs 11,939 bytes −803 Removed claim: summary (P836): The project addresses the improvement of transport safety in the municipality of Hutisko — Solanec. This objective will be achieved by building a barrier-free walkway along the Class II road (II/481) which is the priority communication of the Zlín Region. The walkway will be adapted to persons with reduced mobility. The construction of the walkway will lead to a better connection with the city centre from Soály or Zákopje., remove_old_english_...

24 September 2020

21 September 2020

31 August 2020

28 August 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 11:4511:45, 26 February 2020DG Regio talk contribs 10,964 bytes +803 Created claim: summary (P836): The project addresses the improvement of transport safety in the municipality of Hutisko — Solanec. This objective will be achieved by building a barrier-free walkway along the Class II road (II/481) which is the priority communication of the Zlín Region. The walkway will be adapted to persons with reduced mobility. The construction of the walkway will lead to a better connection with the city centre from Soály or Zákopje., Adding English summary

17 February 2020

6 February 2020

30 January 2020

28 January 2020

11 January 2020