Revision history of "Equipment of the compost plant in the village Chrást u Plzně" (Q62859)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 20:4420:44, 12 October 2024DG Regio talk contribs 46,160 bytes +17 Set a claim value: summary (P836): O plano do projeto consiste na aquisição de equipamentos da planta de compostagem, que estará no terreno, k.ú. Roubaram ao Pilsen. A unidade de compostagem (os trabalhos de construção para a adaptação das áreas não fazem parte do pedido de subvenção) é constituída pela área de compostagem e pela área de manuseamento com uma área de cerca de 800 m2.

7 March 2024

15 January 2024

6 July 2023

12 June 2023

17 February 2023

24 July 2022

  • curprev 12:3912:39, 24 July 2022DG Regio talk contribs 42,949 bytes +24,070 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

13 December 2021

2 December 2021

28 November 2021

  • curprev 23:2023:20, 28 November 2021DG Regio talk contribs 14,652 bytes +1,181 Created claim: summary (P836): Le plan de projet consiste en l’acquisition de l’équipement de l’usine de compost, qui sera sur le terrain, k.ú. Abri à Pilsen. L’usine de compostage (les travaux de construction pour le traitement de surface ne font pas partie de la demande de subvention) se compose d’une aire de compostage et d’une surface de manutention d’environ 800 m²., translated_summary
  • curprev 23:2023:20, 28 November 2021DG Regio talk contribs 13,471 bytes +115 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 13:0313:03, 23 October 2020DG Regio talk contribs 13,809 bytes +121 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 13:0313:03, 23 October 2020DG Regio talk contribs 13,688 bytes −130 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 13:0313:03, 23 October 2020DG Regio talk contribs 13,818 bytes +1,149 Created claim: summary (P836): The project plan consists of the acquisition of equipment of the composting plant, which will be on the land, k.ú. Steal from Pilsen. The composting plant (building works for the adaptation of the areas are not part of the subsidy application) consists of the composting area and the handling area with an area of about 800 m²., translated_summary
  • curprev 13:0313:03, 23 October 2020DG Regio talk contribs 12,669 bytes −673 Removed claim: summary (P836): The project plan consists of purchasing equipment for ageing which will be on the cadastral area of the cadastral area. Protected at Pilsen. An ageing one (construction work for treatment of areas not covered by a grant application) is made up of a compost and handling area of approximately 800 m²., remove_old_english_translation

22 September 2020

17 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 11:4811:48, 26 February 2020DG Regio talk contribs 11,642 bytes +673 Created claim: summary (P836): The project plan consists of purchasing equipment for ageing which will be on the cadastral area of the cadastral area. Protected at Pilsen. An ageing one (construction work for treatment of areas not covered by a grant application) is made up of a compost and handling area of approximately 800 m²., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020