Revision history of "Modernisation of the Dobříš collection yard" (Q62856)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

22 December 2023

12 June 2023

20 February 2023

17 February 2023

24 July 2022

  • curprev 12:3912:39, 24 July 2022DG Regio talk contribs 44,243 bytes +24,964 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

28 November 2021

  • curprev 23:2023:20, 28 November 2021DG Regio talk contribs 13,932 bytes +1,227 Created claim: summary (P836): La modernisation du chantier de collecte existant facilitera considérablement le traitement des déchets, tandis que les zones renforcées existantes du complexe, qui sont dans un état technique insatisfaisant, seront réparées. Dans le même temps, il y a une augmentation substantielle de la capacité du chantier de collecte (l’état actuel des opérations ne permet pas d’augmenter la capacité)., translated_summary
  • curprev 23:2023:20, 28 November 2021DG Regio talk contribs 12,705 bytes +106 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 13:0313:03, 23 October 2020DG Regio talk contribs 13,048 bytes +105 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 13:0313:03, 23 October 2020DG Regio talk contribs 12,943 bytes −91 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 13:0313:03, 23 October 2020DG Regio talk contribs 13,034 bytes +1,223 Created claim: summary (P836): Modernisation of the existing collection yard will significantly facilitate the handling of waste, at the same time the existing reinforced areas of the complex will be repaired, which are in an unsatisfactory technical condition. At the same time, there is a substantial increase in the operational capacity of the collection yard (the current state of operation does not allow the increased capacity)., translated_summary
  • curprev 13:0313:03, 23 October 2020DG Regio talk contribs 11,811 bytes −760 Removed claim: summary (P836): The modernisation of the existing collection by the Court of Justice will greatly facilitate the handling of waste, while at the same time correcting existing paved areas which are in a non-compliant technical state will be corrected. At the same time, the capacity of the collecting Court is substantially increased (the current state of operation does not allow for increased capacity)., remove_old_english_translation

24 September 2020

17 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 11:4811:48, 26 February 2020DG Regio talk contribs 11,295 bytes +760 Created claim: summary (P836): The modernisation of the existing collection by the Court of Justice will greatly facilitate the handling of waste, while at the same time correcting existing paved areas which are in a non-compliant technical state will be corrected. At the same time, the capacity of the collecting Court is substantially increased (the current state of operation does not allow for increased capacity)., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020