Revision history of "Remediation of the old environmental burden on the premises of EURO-Šarm, warehouse Pilsen-south part" (Q62447)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 08:3908:39, 13 October 2024DG Regio talk contribs 46,881 bytes −15 Changed label, description and/or aliases in pt
  • curprev 08:3908:39, 13 October 2024DG Regio talk contribs 46,896 bytes −14 Set a claim value: summary (P836): O objetivo do projeto é aplicar medidas corretivas na parte sul do armazém da EURO-Šarm em Pilsen. A necessidade de medidas corretivas baseia-se numa análise de risco elaborada que revelou riscos sanitários e ecológicos devidos à poluição do ambiente rochoso e das águas subterrâneas, em especial por hidrocarbonetos alifáticos clorados.

23 March 2024

15 January 2024

12 June 2023

17 February 2023

24 July 2022

  • curprev 11:4511:45, 24 July 2022DG Regio talk contribs 44,238 bytes +25,315 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 21:5921:59, 2 December 2021DG Regio talk contribs 14,875 bytes +1,198 Created claim: summary (P836): Gegenstand des Projekts ist die Durchführung von Korrekturmaßnahmen im südlichen Teil des EURO-Šarm-Lagers in Pilsen. Die Notwendigkeit von Korrekturmaßnahmen beruht auf einer Risikoanalyse, die durch die Verschmutzung der Gesteinsumgebung und des Grundwassers, insbesondere der chlorierten aliphatischen Kohlenwasserstoffe, Gesundheits- und Umweltrisiken nachgewiesen hat., translated_summary
  • curprev 21:5921:59, 2 December 2021DG Regio talk contribs 13,677 bytes +165 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 23:1223:12, 28 November 2021DG Regio talk contribs 13,512 bytes +1,199 Created claim: summary (P836): Le projet a pour objet la mise en œuvre de mesures correctives dans la partie sud de l’entrepôt EURO-Šarm à Pilsen. La nécessité de mesures correctives repose sur une analyse des risques qui a démontré les risques pour la santé et l’environnement dus à la pollution du milieu rocheux et des eaux souterraines, en particulier les hydrocarbures aliphatiques chlorés., translated_summary
  • curprev 23:1223:12, 28 November 2021DG Regio talk contribs 12,313 bytes +163 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 12:0312:03, 23 October 2020DG Regio talk contribs 12,599 bytes +162 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:0312:03, 23 October 2020DG Regio talk contribs 12,437 bytes −139 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:0312:03, 23 October 2020DG Regio talk contribs 12,576 bytes +1,165 Created claim: summary (P836): The purpose of the project is to implement corrective measures in the southern part of EURO-Šarm’s warehouse in Pilsen. The need for corrective action is based on an elaborate risk analysis that has shown health and ecological risks due to pollution of the rock environment and groundwater in particular by chlorinated aliphatic hydrocarbons., translated_summary
  • curprev 12:0312:03, 23 October 2020DG Regio talk contribs 11,411 bytes −754 Removed claim: summary (P836): The purpose of the project is the implementation of corrective measures in the southern part of the warehouse of EUROŠarm in Plzeň. The need to implement corrective measures is based on a refined risk analysis that has demonstrated the health and environmental risks caused by pollution of the rock environment and groundwater, in particular by chlorinated aliphatic hydrocarbons., remove_old_english_translation

22 September 2020

17 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 11:1911:19, 26 February 2020DG Regio talk contribs 10,882 bytes +754 Created claim: summary (P836): The purpose of the project is the implementation of corrective measures in the southern part of the warehouse of EUROŠarm in Plzeň. The need to implement corrective measures is based on a refined risk analysis that has demonstrated the health and environmental risks caused by pollution of the rock environment and groundwater, in particular by chlorinated aliphatic hydrocarbons., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020