Revision history of "Reconstruction of the Nepolis sidewalk" (Q62421)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 08:4008:40, 13 October 2024DG Regio talk contribs 50,753 bytes +29 Set a claim value: summary (P836): A ideia principal do projeto é aumentar o padrão de vida cotidiana dos habitantes, especialmente com ênfase na segurança dos pedestres durante a sua circulação na aldeia. O objectivo do projecto é a reconstrução da passarela pedonal utilizando o caminho para as paragens do transporte público de autocarro, que é um meio essencial de transporte para escolas, emprego, etc. O projecto também irá resolver a falta de liberdade de barreiras. É uma calçada...

22 March 2024

15 January 2024

22 December 2023

12 June 2023

17 February 2023

24 July 2022

  • curprev 11:4311:43, 24 July 2022DG Regio talk contribs 47,534 bytes +27,150 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 22:0122:01, 2 December 2021DG Regio talk contribs 15,868 bytes +1,322 Created claim: summary (P836): Hauptidee des Projekts ist es, den Standard des Alltags der Bewohner zu erhöhen, mit besonderem Schwerpunkt auf der Sicherheit von Fußgängern während ihrer Bewegung im Dorf. Gegenstand des Projekts ist die Wiederherstellung des Fußgängersteigs mit der Straße zu öffentlichen Bushaltestellen, die ein wesentliches Mittel für den Transport zu Schulen, Arbeitsplätzen usw. ist. Es ist ein Pflaster auf den Straßen II/327 und III/32412. Zielgruppe des P...
  • curprev 22:0122:01, 2 December 2021DG Regio talk contribs 14,546 bytes +101 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 23:1123:11, 28 November 2021DG Regio talk contribs 14,445 bytes +1,439 Created claim: summary (P836): L’idée principale du projet est d’augmenter le niveau de vie quotidienne des résidents, en mettant particulièrement l’accent sur la sécurité des piétons lors de leur déplacement dans le village. Le projet a pour objet la reconstruction du trottoir piétonnier par la route vers les arrêts de transport public par autobus, qui est un moyen essentiel de transport vers les écoles, les emplois, etc. Le projet permettra également de remédier à l’absence...
  • curprev 23:1123:11, 28 November 2021DG Regio talk contribs 13,006 bytes +96 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 12:0212:02, 23 October 2020DG Regio talk contribs 13,359 bytes +97 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:0212:02, 23 October 2020DG Regio talk contribs 13,262 bytes −97 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:0212:02, 23 October 2020DG Regio talk contribs 13,359 bytes +1,367 Created claim: summary (P836): The main idea of the project is to increase the standard of everyday life of the inhabitants, especially with emphasis on the safety of pedestrians during their movement in the village. The object of the project is the reconstruction of the pedestrian walkway using the way to the stops of public bus transport, which is an essential means of transporting to schools, employment, etc.The project will also solve the lack of barrier-freeness. It is a...
  • curprev 12:0212:02, 23 October 2020DG Regio talk contribs 11,992 bytes −904 Removed claim: summary (P836): The main thrust of the project is to increase the standard of daily life of the population, with particular emphasis on the safety of pedestrian movements in the municipality. The project covers the reconstruction of the pedestrian corridor using the road to bus stops, which is an essential means of transport to schools, jobs, etc. The project will also address the lack of accessibility. This is a pedestrian at the roads of II/327 and III/3241...

21 September 2020

31 August 2020

28 August 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 11:1911:19, 26 February 2020DG Regio talk contribs 11,103 bytes +904 Created claim: summary (P836): The main thrust of the project is to increase the standard of daily life of the population, with particular emphasis on the safety of pedestrian movements in the municipality. The project covers the reconstruction of the pedestrian corridor using the road to bus stops, which is an essential means of transport to schools, jobs, etc. The project will also address the lack of accessibility. This is a pedestrian at the roads of II/327 and III/32412....

17 February 2020

6 February 2020

30 January 2020

28 January 2020

11 January 2020