Revision history of "Sidewalk between school and dining room, Border" (Q62309)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

22 December 2023

19 June 2023

12 June 2023

17 February 2023

24 July 2022

  • curprev 11:2711:27, 24 July 2022DG Regio talk contribs 48,069 bytes +27,617 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 21:5221:52, 2 December 2021DG Regio talk contribs 15,932 bytes +1,385 Created claim: summary (P836): Das Projekt löst den Neubau des Pflasters entlang der Straße II/363 auf die Verzögerung der Dörfer (in intravilán) Pomezí. Der Bau des Gehsteigs wird die Sicherheit aller Bewegung und Orientierung aller Fußgänger um die Straße II/363 in Pomezí erhöhen, insbesondere zwischen der Grundschule, der Schulkantine und dem Kindergarten. Die Haupttätigkeit ist daher die physische Verwirklichung. Nebentätigkeiten sind Machbarkeitsstudien, Auswahlverfahren...
  • curprev 21:5221:52, 2 December 2021DG Regio talk contribs 14,547 bytes +106 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 23:1223:12, 28 November 2021DG Regio talk contribs 14,441 bytes +1,442 Created claim: summary (P836): Le projet résout le nouveau bâtiment du trottoir le long de la route II/363 sur le retard des villages (in intravilán) Pomezí. La construction du trottoir augmentera la sécurité de tous les déplacements et l’orientation de tous les piétons autour de la route II/363 à Pomezí, en particulier entre l’école primaire, la cantine scolaire et la maternelle. L’activité principale est donc la réalisation physique. Les activités connexes seront les études...
  • curprev 23:1223:12, 28 November 2021DG Regio talk contribs 12,999 bytes +115 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 11:5111:51, 23 October 2020DG Regio talk contribs 13,333 bytes +106 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:5111:51, 23 October 2020DG Regio talk contribs 13,227 bytes −111 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:5111:51, 23 October 2020DG Regio talk contribs 13,338 bytes +1,348 Created claim: summary (P836): The project solves a new pavement along road II/363 on the delay of municipalities (in intravilan) Borderlands. The construction of the pavement will increase the safety of all the movement and orientation of all pedestrians around Route II/363 in Pomezí, especially between the primary school, the school canteen and the kindergarten. The main activity is therefore physical realisation. Side activities will be feasibility studies, tendering and p...
  • curprev 11:5111:51, 23 October 2020DG Regio talk contribs 11,990 bytes −947 Removed claim: summary (P836): The project addresses the pavement of the walkway along the II/363 road to a race to the rear by a municipality (v intravicol). The building of a walkway will increase the security of all pedestrian movements and the orientation of all pedestrians around the II/363 road at the border, in particular between the primary school, the school canteen and the parent. The main activity is therefore physical implementation. Feasibility studies, selecti...

24 September 2020

21 September 2020

31 August 2020

28 August 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 11:2911:29, 26 February 2020DG Regio talk contribs 11,160 bytes +947 Created claim: summary (P836): The project addresses the pavement of the walkway along the II/363 road to a race to the rear by a municipality (v intravicol). The building of a walkway will increase the security of all pedestrian movements and the orientation of all pedestrians around the II/363 road at the border, in particular between the primary school, the school canteen and the parent. The main activity is therefore physical implementation. Feasibility studies, selection...

17 February 2020

6 February 2020

30 January 2020

28 January 2020

11 January 2020