Revision history of "Removal of old ecological load in the premises Slovácké strojírny, a.s. – SUB plant 07 MEP Postřelmov" (Q62284)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 08:3908:39, 13 October 2024DG Regio talk contribs 49,268 bytes +2 Changed label, description and/or aliases in pt
  • curprev 08:3908:39, 13 October 2024DG Regio talk contribs 49,266 bytes −21 Set a claim value: summary (P836): O objetivo do projeto é eliminar a antiga carga ecológica nas instalações da recorrente, a fábrica de Postřelmov do deputado europeu O7. A carga ambiental será removida pelo método de extração de solos nas antigas fossas subterrâneas da antiga galvanovna, remediação do ambiente rochoso pelo método in situ e monitoramento da qualidade das águas subterrâneas.O projeto é da empresa Slovácké strojírny, a. s.

23 March 2024

15 January 2024

22 December 2023

12 June 2023

17 February 2023

24 July 2022

  • curprev 11:2311:23, 24 July 2022DG Regio talk contribs 46,095 bytes +26,476 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 21:5521:55, 2 December 2021DG Regio talk contribs 15,234 bytes +1,237 Created claim: summary (P836): Gegenstand des Projekts ist die Beseitigung der alten ökologischen Belastung in den Räumlichkeiten des Klägers, Werk O7 MEP Postřelmov. Die ökologische Belastung wird durch die Methode der Gewinnung von verschmutzten Erden in den ehemaligen unterirdischen Gruben der alten Galvanisierungsanlage, die Sanierung der Gesteinsumgebung durch die In-situ-Methode und die Überwachung der Grundwasserqualität entfernt., translated_summary
  • curprev 21:5521:55, 2 December 2021DG Regio talk contribs 13,997 bytes +193 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 23:1123:11, 28 November 2021DG Regio talk contribs 13,804 bytes +1,325 Created claim: summary (P836): L’objet du projet est la suppression de l’ancienne charge écologique dans les locaux de la requérante, l’usine O7 MEP Postřelmov. La charge écologique sera éliminée par la méthode d’extraction des terres polluées dans les anciennes fosses souterraines de l’ancienne usine de galvanisation, l’assainissement de l’environnement rocheux par la méthode in situ et la surveillance de la qualité des eaux souterraines. Le demandeur du projet est la sociét...
  • curprev 23:1123:11, 28 November 2021DG Regio talk contribs 12,479 bytes +182 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 11:5011:50, 23 October 2020DG Regio talk contribs 12,746 bytes +167 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:5011:50, 23 October 2020DG Regio talk contribs 12,579 bytes −165 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:5011:50, 23 October 2020DG Regio talk contribs 12,744 bytes +1,228 Created claim: summary (P836): The object of the project is to remove the old ecological burden in the applicant’s premises, the O7 MEP Postřelmov plant. The environmental burden will be removed by the method of extraction of soils in the former underground pits of the old galvanovna, remediation of the rock environment by method of in situ and monitoring of groundwater quality.The project is the company Slovácké strojírny, a. s., translated_summary
  • curprev 11:5011:50, 23 October 2020DG Regio talk contribs 11,516 bytes −788 Removed claim: summary (P836): The purpose of the project is to eliminate the old environmental burden on the applicant’s premises, O7 MEP Postrelmov. The ecological burden will be removed by the method of extraction of contaminated soils at the sites of former galvanic house, the in situ remediation of the rock environment and the quality monitoring of the groundwater. the applicant of the project is Slovácké Mechanical Engineering, a. s., remove_old_english_translation

24 September 2020

22 September 2020

17 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 11:2911:29, 26 February 2020DG Regio talk contribs 11,016 bytes +788 Created claim: summary (P836): The purpose of the project is to eliminate the old environmental burden on the applicant’s premises, O7 MEP Postrelmov. The ecological burden will be removed by the method of extraction of contaminated soils at the sites of former galvanic house, the in situ remediation of the rock environment and the quality monitoring of the groundwater. the applicant of the project is Slovácké Mechanical Engineering, a. s., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020