Revision history of "Increasing transport safety in Holice – construction of the pavement Podhráz – Holice" (Q62216)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 23:1023:10, 12 October 2024DG Regio talk contribs 52,250 bytes +2 Changed label, description and/or aliases in pt
  • curprev 23:1023:10, 12 October 2024DG Regio talk contribs 52,248 bytes −2 Set a claim value: summary (P836): O projeto proposto visa aumentar a segurança dos transportes na cidade de Holice através da construção de uma nova calçada ao longo da estrada de classe III (estrada III/29817). A calçada será uma ligação entre o pavimento existente construído na borda comum do k.ú. Regra Superior e k.o. Holice na Boémia e o pavimento existente na direcção do centro de Holice. A calçada será construída em um canto muito vago nas imediações do edifício e a implementa...

22 March 2024

15 January 2024

22 December 2023

12 June 2023

17 February 2023

24 July 2022

  • curprev 11:1411:14, 24 July 2022DG Regio talk contribs 49,060 bytes +28,375 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 21:5321:53, 2 December 2021DG Regio talk contribs 16,099 bytes +1,398 Created claim: summary (P836): Ziel des Projekts ist die Verbesserung der Verkehrssicherheit in Holice durch den Bau eines neuen Weges entlang der Straße der dritten Klasse (Straße III/29817). Der Gehweg wird mit dem an der gemeinsamen Grenze von k.ú gebauten bestehenden Bürgersteig verbunden sein. Oberteil und k.ú. Holice v Čechách und der vorhandene Pflaster in Richtung des Zentrums von Holic. Der Pflaster wird in einer sehr dunklen Wendung in unmittelbarer Nähe des Gebäude...
  • curprev 21:5321:53, 2 December 2021DG Regio talk contribs 14,701 bytes +146 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 23:1423:14, 28 November 2021DG Regio talk contribs 14,555 bytes +1,374 Created claim: summary (P836): Le projet vise à améliorer la sécurité routière à Holice par la construction d’un nouveau trottoir le long de la route de troisième classe (route III/29817). Le trottoir sera relié au trottoir existant construit sur la frontière commune de k.ú. Section supérieure et k.ú. Holice v Čechách et le trottoir existant dans la direction du centre de Holic. Le trottoir sera construit dans un virage très obscur à proximité immédiate du bâtiment et la réal...
  • curprev 23:1423:14, 28 November 2021DG Regio talk contribs 13,181 bytes +158 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 11:3411:34, 23 October 2020DG Regio talk contribs 13,472 bytes +149 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:3411:34, 23 October 2020DG Regio talk contribs 13,323 bytes −152 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:3411:34, 23 October 2020DG Regio talk contribs 13,475 bytes +1,376 Created claim: summary (P836): The proposed project is aimed at increasing transport safety in the town of Holice through the construction of a new sidewalk along the III. class road (road III/29817). The sidewalk will be a link between the existing pavement built on the common border of k.ú. Upper Rule and k.o. Holice in Bohemia and the existing pavement in the direction of the centre of Holice. The sidewalk will be built in a very vague corner in the immediate vicinity of t...
  • curprev 11:3411:34, 23 October 2020DG Regio talk contribs 12,099 bytes −948 Removed claim: summary (P836): The present project aims at increasing the safety of the shavers traffic through the construction of a new walkway along the road III class (III/29817 road). The walkway will be the connection of an existing corridor built at the common border of the cadastral district. Upper Director and the cadastral district of the region. Holice in Bohemia and the existing pavement in the direction of the Holic. In the immediate vicinity of the building, t...

21 September 2020

31 August 2020

28 August 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 11:2611:26, 26 February 2020DG Regio talk contribs 11,247 bytes +948 Created claim: summary (P836): The present project aims at increasing the safety of the shavers traffic through the construction of a new walkway along the road III class (III/29817 road). The walkway will be the connection of an existing corridor built at the common border of the cadastral district. Upper Director and the cadastral district of the region. Holice in Bohemia and the existing pavement in the direction of the Holic. In the immediate vicinity of the building, the...

17 February 2020

6 February 2020

30 January 2020

28 January 2020

11 January 2020