Revision history of "Reconstruction, modernisation and construction of sidewalks in the village Šenov u Nového Jičín" (Q62185)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 08:3808:38, 13 October 2024DG Regio talk contribs 51,900 bytes −5 Set a claim value: summary (P836): O projeto inclui a construção de um novo pavimento ao longo do MK, a reconstrução com modernização de duas calçadas ao longo da estrada I/57, a construção de uma nova passagem para peões com iluminação e um novo ponto de passagem para a estrada I/57 com o objetivo de aumentar a segurança dos peões e das pessoas com mobilidade reduzida. Os objetivos do projeto serão alcançados através da realização de obras de construção. Os riscos do projeto são des...

22 March 2024

15 January 2024

12 June 2023

17 February 2023

24 July 2022

  • curprev 11:1211:12, 24 July 2022DG Regio talk contribs 49,235 bytes +28,244 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 21:5521:55, 2 December 2021DG Regio talk contribs 16,228 bytes +1,414 Created claim: summary (P836): Das Projekt besteht aus dem Bau eines neuen Weges entlang der MK, einem Umbau mit Modernisierung von zwei Gehwegen entlang der Straße I/57, dem Bau einer neuen geteilten Fußgängerüberquerung mit Beleuchtung und einer neuen Kreuzung der I/57 Straße, um die Sicherheit von Fußgängern und Personen mit eingeschränkter Mobilität zu verbessern. Die Ziele des Projekts werden durch die Durchführung von Bauarbeiten erreicht.Die Risiken des Projekts werden...
  • curprev 21:5521:55, 2 December 2021DG Regio talk contribs 14,814 bytes +139 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 23:1323:13, 28 November 2021DG Regio talk contribs 14,675 bytes +1,466 Created claim: summary (P836): Le projet consiste en la construction d’un nouveau trottoir le long de la MK, une reconstruction avec modernisation de deux trottoirs le long de la route I/57, la construction d’un nouveau passage pour piétons avec éclairage et un nouveau point de passage de la route I/57 afin d’améliorer la sécurité des piétons et des personnes à mobilité réduite. Les objectifs du projet seront atteints par la réalisation de travaux de construction. Les risques...
  • curprev 23:1323:13, 28 November 2021DG Regio talk contribs 13,209 bytes +160 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 17:4917:49, 23 October 2020DG Regio talk contribs 13,498 bytes +158 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:4917:49, 23 October 2020DG Regio talk contribs 13,340 bytes −160 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:4917:49, 23 October 2020DG Regio talk contribs 13,500 bytes +1,396 Created claim: summary (P836): The project includes the construction of a new pavement along the MK, reconstruction with modernisation of two sidewalks along the I/57 road, construction of a new pedestrian crossing with illumination and one new crossing point for road I/57 with the aim of increasing the safety of pedestrians and persons with reduced mobility. The objectives of the project will be achieved by carrying out construction works.The risks of the project are describ...
  • curprev 17:4917:49, 23 October 2020DG Regio talk contribs 12,104 bytes −938 Removed claim: summary (P836): The project covers the construction of a new walkway along the MK, reconstruction works on the upgrading of two pavements along communication I/57, construction of a new split, pedestrian crossing, and one new station for crossing the road I/57 in order to improve the safety of pedestrians and persons with reduced mobility. The objectives of the project will be achieved by performing the construction work. the project risks are described in th...

24 September 2020

21 September 2020

31 August 2020

28 August 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 11:2611:26, 26 February 2020DG Regio talk contribs 11,258 bytes +938 Created claim: summary (P836): The project covers the construction of a new walkway along the MK, reconstruction works on the upgrading of two pavements along communication I/57, construction of a new split, pedestrian crossing, and one new station for crossing the road I/57 in order to improve the safety of pedestrians and persons with reduced mobility. The objectives of the project will be achieved by performing the construction work. the project risks are described in the...

17 February 2020

6 February 2020

30 January 2020

28 January 2020

11 January 2020