Revision history of "Sidewalks from the municipal authority to the railway stop in the village Střeň" (Q62161)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 20:4120:41, 12 October 2024DG Regio talk contribs 49,290 bytes +7 Changed label, description and/or aliases in pt
  • curprev 20:4120:41, 12 October 2024DG Regio talk contribs 49,283 bytes +26 Set a claim value: summary (P836): O projeto Chodníky, desde a autoridade municipal até à paragem ferroviária na aldeia de Střeň, centra-se na construção de um novo pavimento ao longo da estrada de base III/44620, que seguirá a calçada que termina no escritório construído em 2014. A sua ligação irá ligar a aldeia para pedestres e, assim, garantir a operação segura dos pedestres dentro do transporte. Os moradores da aldeia são atualmente forçados a partir do OÚ para a parada ferroviár...

20 March 2024

15 January 2024

12 June 2023

17 February 2023

24 July 2022

  • curprev 11:0811:08, 24 July 2022DG Regio talk contribs 46,587 bytes +26,503 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 21:4721:47, 2 December 2021DG Regio talk contribs 15,678 bytes +1,294 Created claim: summary (P836): Das Projekt Chodníky vom Gemeindeamt bis zum Bahnhof im Dorf Střeň konzentriert sich auf den Bau eines neuen Pflasters entlang der Rückgratstraße III/44620, die dem Pflasterende im Jahr 2014 folgen wird. Durch den Anschluss wird das Dorf für Fußgänger verbunden, wodurch der sichere Betrieb von Fußgängern im Zusammenhang mit dem Transport gewährleistet wird. Die Bewohner des Dorfes werden derzeit teilweise von der OÚ zur Bahnhaltestelle der Straß...
  • curprev 21:4721:47, 2 December 2021DG Regio talk contribs 14,384 bytes +112 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 23:1323:13, 28 November 2021DG Regio talk contribs 14,272 bytes +1,312 Created claim: summary (P836): Le projet Chodníky du bureau municipal à la gare ferroviaire du village de Střeň se concentre sur la construction d’un nouveau trottoir le long de la route dorsale III/44620, qui suivra le trottoir se terminant au bureau construit en 2014. En les reliant, le village pour piétons sera relié, assurant ainsi l’exploitation sûre des piétons dans le cadre du transport. Les habitants du village sont actuellement contraints en partie de l’OÚ à l’arrêt...
  • curprev 23:1323:13, 28 November 2021DG Regio talk contribs 12,960 bytes +133 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 13:4513:45, 23 October 2020DG Regio talk contribs 13,276 bytes +140 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 13:4513:45, 23 October 2020DG Regio talk contribs 13,136 bytes −144 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 13:4513:45, 23 October 2020DG Regio talk contribs 13,280 bytes +1,279 Created claim: summary (P836): The project Chodníky from the municipal authority to the railway stop in the village Střeň focuses on the construction of a new pavement along the backbone road III/44620, which will follow the sidewalk ending at the office built in 2014. Their connection will connect the village for pedestrians and thus ensure safe operation of pedestrians within the transport. Residents of the village are currently forced from the OÚ to the railway stop of the...
  • curprev 13:4513:45, 23 October 2020DG Regio talk contribs 12,001 bytes −836 Removed claim: summary (P836): A project of pavements from a municipal authority in the municipality of St John is focused on the construction of a new corridor along the III/44620 backbone communication, building on the corridor ending at the office built up in 2014. They will connect the municipality on foot to ensure safe operation of pedestrians in the context of transport. The residents of the municipality are currently forced to travel on the road part of the day afte...

24 September 2020

21 September 2020

31 August 2020

28 August 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 11:2611:26, 26 February 2020DG Regio talk contribs 11,058 bytes +836 Created claim: summary (P836): A project of pavements from a municipal authority in the municipality of St John is focused on the construction of a new corridor along the III/44620 backbone communication, building on the corridor ending at the office built up in 2014. They will connect the municipality on foot to ensure safe operation of pedestrians in the context of transport. The residents of the municipality are currently forced to travel on the road part of the day after...

17 February 2020

6 February 2020

30 January 2020

28 January 2020

11 January 2020