Revision history of "Increased transport safety in the village Pomezí nad Ohří – pedestrian road" (Q62110)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 08:3808:38, 13 October 2024DG Regio talk contribs 51,412 bytes −5 Changed label, description and/or aliases in pt
  • curprev 08:3808:38, 13 October 2024DG Regio talk contribs 51,417 bytes −15 Set a claim value: summary (P836): O projeto proposto realizará a construção de uma estrada pedonal completamente nova, que ligará as partes mais importantes da aldeia ao longo da movimentada estrada II/606, que é o principal canal para a passagem da fronteira Pomezí nad Ohří/Schirding. A construção desta calçada aumentará significativamente a segurança dos peões e outros utentes da estrada. Todo o comprimento será tratado sem barreiras com elementos de segurança para cegos. O projet...

23 March 2024

15 January 2024

6 July 2023

19 June 2023

12 June 2023

17 February 2023

24 July 2022

  • curprev 11:0011:00, 24 July 2022DG Regio talk contribs 48,240 bytes +27,640 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 21:3921:39, 2 December 2021DG Regio talk contribs 16,027 bytes +1,376 Created claim: summary (P836): Das Projekt wird den Bau einer komplett neuen Fußgängerstraße durchführen, die die wichtigsten Teile des Dorfes entlang der befahrenen Straße II/606 verbindet, die der Hauptzubringer zum Grenzübergang Pomezí nad Ohří/Schirding ist. Der Bau dieses Bürgersteigs wird die Sicherheit von Fußgängern und anderen Verkehrsteilnehmern erheblich verbessern. Entlang der gesamten Länge wird es barrierefrei mit Sicherheitsmerkmalen für die Blinden ausgelegt....
  • curprev 21:3921:39, 2 December 2021DG Regio talk contribs 14,651 bytes +137 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 23:0723:07, 28 November 2021DG Regio talk contribs 14,514 bytes +1,372 Created claim: summary (P836): Le projet réalisera la construction d’une toute nouvelle route piétonne reliant les parties les plus importantes du village le long de la route fréquentée II/606, qui est le principal alimentateur du passage frontalier Pomezí nad Ohří/Schirding. La construction de ce trottoir améliorera considérablement la sécurité des piétons et des autres usagers de la route. Sur toute la longueur, il sera conçu sans barrière avec des dispositifs de sécurité p...
  • curprev 23:0723:07, 28 November 2021DG Regio talk contribs 13,142 bytes +151 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 13:4413:44, 23 October 2020DG Regio talk contribs 13,440 bytes +139 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 13:4413:44, 23 October 2020DG Regio talk contribs 13,301 bytes −149 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 13:4413:44, 23 October 2020DG Regio talk contribs 13,450 bytes +1,332 Created claim: summary (P836): The proposed project will carry out the construction of a completely new pedestrian road, which will connect the most important parts of the village along the busy II/606 road, which is the main conduit to the border crossing Pomezí nad Ohří/Schirding. The construction of this sidewalk will significantly increase the safety of pedestrians and other road users. The whole length will be dealt with barrier-free with safety elements for the blind. T...
  • curprev 13:4413:44, 23 October 2020DG Regio talk contribs 12,118 bytes −894 Removed claim: summary (P836): In the present project, the construction of a completely new road transport communication will be carried out and will connect the most important parts of the municipality along the II/606 road, which is the main driver behind the border crossing between Ohey/Schirding. The construction of this walkway will substantially improve the safety of pedestrians and other road users. Throughout the length, barrier-free safety features for the blind wi...

24 September 2020

21 September 2020

31 August 2020

28 August 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 11:3011:30, 26 February 2020DG Regio talk contribs 11,232 bytes +894 Created claim: summary (P836): In the present project, the construction of a completely new road transport communication will be carried out and will connect the most important parts of the municipality along the II/606 road, which is the main driver behind the border crossing between Ohey/Schirding. The construction of this walkway will substantially improve the safety of pedestrians and other road users. Throughout the length, barrier-free safety features for the blind will...

17 February 2020

6 February 2020

30 January 2020

28 January 2020

11 January 2020