Revision history of "Implementation of dedusting from biomass boilers – Pelhřimov" (Q61723)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 20:3720:37, 12 October 2024DG Regio talk contribs 45,180 bytes −1 Changed label, description and/or aliases in pt
  • curprev 20:3720:37, 12 October 2024DG Regio talk contribs 45,181 bytes 0 Set a claim value: summary (P836): O projeto visa a instalação de um eletrofiltro de gás de combustão nas caldeiras K5 e K6, que fazem parte da chamada sala de caldeiras K2 operada pela empresa. IROMEZ em U Agrostroje 1412, Pelhřimov. O objetivo do projeto é reduzir significativamente as emissões de poluentes sólidos (a seguir designados «TZL»).

12 March 2024

15 January 2024

12 June 2023

17 February 2023

24 July 2022

  • curprev 10:1710:17, 24 July 2022DG Regio talk contribs 42,511 bytes +23,688 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 22:0622:06, 2 December 2021DG Regio talk contribs 15,026 bytes +1,134 Created claim: summary (P836): Das Projekt konzentriert sich auf die Installation eines Elektrofilters von Rauchgasen auf Kessel K5 und K6, die Teil des so genannten Kesselraums K2 sind, der vom Verband betrieben wird. IROMEZ bei U Agrostroje 1412, Pelhřimov. Ziel des Projekts ist es, die Produktion von Staubemissionen deutlich zu reduzieren., translated_summary
  • curprev 22:0622:06, 2 December 2021DG Regio talk contribs 13,892 bytes +122 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 23:0523:05, 28 November 2021DG Regio talk contribs 13,770 bytes +1,154 Created claim: summary (P836): Le projet est axé sur l’installation d’un électrofiltre de gaz de combustion sur les chaudières K5 et K6, qui font partie de la soi-disant chaufferie K2 exploitée par l’association. IROMEZ à U Agrostroje 1412, Pelhřimov. L’objectif du projet est de réduire considérablement la production d’émissions de poussières., translated_summary
  • curprev 23:0523:05, 28 November 2021DG Regio talk contribs 12,616 bytes +133 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 12:5012:50, 23 October 2020DG Regio talk contribs 12,932 bytes +122 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:5012:50, 23 October 2020DG Regio talk contribs 12,810 bytes −133 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:5012:50, 23 October 2020DG Regio talk contribs 12,943 bytes +1,138 Created claim: summary (P836): The project is aimed at installing an electrofilter of flue gas on boilers K5 and K6, which are part of the so-called boiler room K2 operated by the company. IROMEZ at U Agrostroje 1412, Pelhřimov. The aim of the project is to significantly reduce emissions of solid pollutants (hereinafter referred to as ‘TZL’)., translated_summary
  • curprev 12:5012:50, 23 October 2020DG Regio talk contribs 11,805 bytes −653 Removed claim: summary (P836): The project aims at installing the electric flue-gas filter on boilers K5 and K6, which are part of the so-called K2 boiler operated by others. IROMEZ at U Agromachinery 1412, Pelhřimov. The project aims at a significant reduction in the production of dust emissions (“dust”)., remove_old_english_translation

22 September 2020

17 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 11:0911:09, 26 February 2020DG Regio talk contribs 11,168 bytes +653 Created claim: summary (P836): The project aims at installing the electric flue-gas filter on boilers K5 and K6, which are part of the so-called K2 boiler operated by others. IROMEZ at U Agromachinery 1412, Pelhřimov. The project aims at a significant reduction in the production of dust emissions (“dust”)., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020