Revision history of "Ponds – Intensification of the water supply" (Q61387)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 08:3508:35, 13 October 2024DG Regio talk contribs 49,525 bytes 0 Changed label, description and/or aliases in pt
  • curprev 08:3508:35, 13 October 2024DG Regio talk contribs 49,525 bytes −4 Set a claim value: summary (P836): O projeto apresentado propõe uma intensificação do abastecimento de água com um comprimento total de 898,42 m. Execução do projeto de ligação de novos pontos de amostragem. O abastecimento de água existente é construído principalmente nos anos 70. Devido às dimensões insuficientes, não permite a ligação de outras propriedades e por causa do mau desempenho mostra uma falha alta devido a perdas de água significativas. A execução do projeto terá um con...

23 March 2024

15 January 2024

6 July 2023

12 June 2023

20 February 2023

17 February 2023

24 July 2022

  • curprev 09:4509:45, 24 July 2022DG Regio talk contribs 46,569 bytes +26,778 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 21:4721:47, 2 December 2021DG Regio talk contribs 15,272 bytes +1,293 Created claim: summary (P836): Das vorgeschlagene Projekt schlägt eine Intensivierung des Wasserversorgungssystems mit einer Gesamtlänge von 898,42 m vor. Die bestehende Wasserversorgung wird vor allem in den 1970er Jahren gebaut. Aufgrund unzureichender Abmessungen lässt sie den Anschluss anderer Immobilien nicht zu und hat aufgrund schlechter Bauweise eine hohe Ausfallrate aufgrund erheblicher Wasserverluste. Die Durchführung des Projekts wird einen wichtigen Beitrag zum Um...
  • curprev 21:4721:47, 2 December 2021DG Regio talk contribs 13,979 bytes +105 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 23:0123:01, 28 November 2021DG Regio talk contribs 13,874 bytes +1,447 Created claim: summary (P836): Le projet proposé propose une intensification du réseau d’approvisionnement en eau d’une longueur totale de 898,42 m. En mettant en œuvre le projet de raccordement de nouveaux points d’approvisionnement. L’approvisionnement en eau existant est construit principalement dans les années 1970. En raison de dimensions insuffisantes, il ne permet pas le raccordement d’autres biens immobiliers et en raison d’une mauvaise conception, il a un taux de déf...
  • curprev 23:0123:01, 28 November 2021DG Regio talk contribs 12,427 bytes +118 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 12:0912:09, 23 October 2020DG Regio talk contribs 12,758 bytes +104 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:0912:09, 23 October 2020DG Regio talk contribs 12,654 bytes −104 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:0912:09, 23 October 2020DG Regio talk contribs 12,758 bytes +1,312 Created claim: summary (P836): The submitted project proposes an intensification of the water supply with a total length of 898.42 m. Implementation of the project to connect new sampling points. The existing water supply is built mainly in the 70s. Due to insufficient dimensions, it does not allow for connection of other properties and because of poor performance it shows a high failure due to significant water losses. The implementation of the project will have a fundamenta...
  • curprev 12:0912:09, 23 October 2020DG Regio talk contribs 11,446 bytes −876 Removed claim: summary (P836): The present project proposes an increase in the total length of 898.42 m for the connection of the current project to the connection of new demand points. The existing water supply is built predominantly in the 70s. because of insufficient dimensions, it is not possible to link additional properties and, because of poor performance, there is a high failure to produce significant water losses. The implementation of the project will make an esse...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 10:5510:55, 26 February 2020DG Regio talk contribs 11,061 bytes +876 Created claim: summary (P836): The present project proposes an increase in the total length of 898.42 m for the connection of the current project to the connection of new demand points. The existing water supply is built predominantly in the 70s. because of insufficient dimensions, it is not possible to link additional properties and, because of poor performance, there is a high failure to produce significant water losses. The implementation of the project will make an essent...