Revision history of "Group water supply Kopidlnsko" (Q61372)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

12 June 2023

20 February 2023

17 February 2023

13 August 2022

  • curprev 15:3215:32, 13 August 2022DG Regio talk contribs 47,920 bytes +28,045 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, lv, ga, sl, bg, mt, pt, da, ro, sv, cs, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, lv, ga, sl, bg, mt, pt, da, ro, sv,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 21:4721:47, 2 December 2021DG Regio talk contribs 15,160 bytes +1,470 Created claim: summary (P836): Ziel des Projekts ist es, die Trinkwasserversorgung in der entsprechenden Menge für das vom Kopidlnska-Teil abgedeckte Gebiet sicherzustellen. Dabei geht es um die Bereitstellung einer zusätzlichen Trinkwasserquelle, da die vorhandene Trinkwasserquelle, das Bohrloch R-3, aufgrund der auferlegten Entnahmebeschränkungen am Rande seiner Kapazität liegt. Das Projekt umfasst den Bau der Versorgungsleitung Staňkova Lhota – Rakov Batín, die den Anschlu...
  • curprev 21:4721:47, 2 December 2021DG Regio talk contribs 13,690 bytes +93 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 23:0023:00, 28 November 2021DG Regio talk contribs 13,597 bytes +1,520 Created claim: summary (P836): L’objectif du projet est d’assurer l’approvisionnement en eau potable en quantité appropriée pour la zone couverte par la partie Kopidlnska. Il s’agit de fournir une source supplémentaire d’eau potable, étant donné que la source d’eau potable existante, le forage R-3, se trouve au bord de sa capacité en raison de la restriction imposée au captage. Le projet comprend la construction de la ligne d’approvisionnement Staňkova Lhota — Rakov Batín, pe...
  • curprev 23:0023:00, 28 November 2021DG Regio talk contribs 12,077 bytes +104 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 12:0912:09, 23 October 2020DG Regio talk contribs 12,422 bytes +88 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:0912:09, 23 October 2020DG Regio talk contribs 12,334 bytes −103 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:0912:09, 23 October 2020DG Regio talk contribs 12,437 bytes +1,415 Created claim: summary (P836): The aim of the project is to ensure the supply of drinking water in the corresponding quantity for the area of Kopidlnska. It is about providing an additional source of drinking water, as the existing source of drinking water, R-3, is at the edge of its capacity due to the restrictions on consumption. The project includes the construction of the supply line Staňkova Lhota – Rakov Batín, allowing connection to the Sobotka group water supply sourc...
  • curprev 12:0912:09, 23 October 2020DG Regio talk contribs 11,022 bytes −965 Removed claim: summary (P836): The project aims at ensuring the supply of drinking water in the corresponding quantity for the part of the Kopivnska part. It is about providing another source of drinking water, as the existing source of drinking water, well R-3, is at the edge of its capacity thanks to the constraint imposed. The project involves the construction of a number of Staňkova Lhota — Rakov Baltín, allowing for connection with the resources of the group water supp...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 10:5510:55, 26 February 2020DG Regio talk contribs 10,718 bytes +965 Created claim: summary (P836): The project aims at ensuring the supply of drinking water in the corresponding quantity for the part of the Kopivnska part. It is about providing another source of drinking water, as the existing source of drinking water, well R-3, is at the edge of its capacity thanks to the constraint imposed. The project involves the construction of a number of Staňkova Lhota — Rakov Baltín, allowing for connection with the resources of the group water supply...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020