Revision history of "WWTP and sewerage system Malovice and Malovičky" (Q61205)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 23:0723:07, 12 October 2024DG Regio talk contribs 52,039 bytes 0 Changed label, description and/or aliases in pt
  • curprev 23:0723:07, 12 October 2024DG Regio talk contribs 52,039 bytes −7 Set a claim value: summary (P836): O estado atual do sistema de tratamento de águas residuais em Malovice e Malovičky é insatisfatório. A limpeza do esgoto é realizada em fossas sépticas e o esgoto está localizado na lagoa Malovice. Propõe-se a construção de uma nova estação de tratamento de águas residuais (capacidade 400 EO) com a capacitância dos drenos livres existentes através das câmaras de resistência construídas em linhas de esgoto. A ligação da rede de esgotos de Malovice a...

23 March 2024

15 January 2024

22 December 2023

6 July 2023

12 June 2023

20 February 2023

17 February 2023

24 July 2022

  • curprev 09:2509:25, 24 July 2022DG Regio talk contribs 48,572 bytes +28,738 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 21:4021:40, 2 December 2021DG Regio talk contribs 15,101 bytes +1,444 Created claim: summary (P836): Der derzeitige Zustand des Abwasserbehandlungssystems in Malovice und Malovičky ist unzureichend. Die Abwasserreinigung erfolgt in Klärtanks und das Abwassersystem ist im Teich Malovický kulminiert. Es wird vorgeschlagen, eine neue Kläranlage (Kapazität 400 EO) mit der Erfassung bestehender kostenloser Versorgungsbetriebe durch die auf den entstehenden Kanalleitungen errichteten Beleuchtungskammern zu errichten. Die Verbindung des Kanalisationsn...
  • curprev 21:4021:40, 2 December 2021DG Regio talk contribs 13,657 bytes +104 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 22:5822:58, 28 November 2021DG Regio talk contribs 13,553 bytes +1,501 Created claim: summary (P836): L’état actuel du système de traitement des eaux usées à Malovice et Malovičky est insuffisant. Le nettoyage des eaux usées a lieu dans des fosses septiques et le système d’égouts est achevé dans l’étang de Malovický. Il est proposé de construire une nouvelle station d’épuration des eaux usées (capacité 400 EO) avec le captage des services publics gratuits existants à travers les chambres d’éclairement construites sur les conduites d’égout émerge...
  • curprev 22:5822:58, 28 November 2021DG Regio talk contribs 12,052 bytes +134 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

  • curprev 11:4511:45, 23 October 2020DG Regio talk contribs 12,367 bytes +107 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:4511:45, 23 October 2020DG Regio talk contribs 12,260 bytes −98 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:4511:45, 23 October 2020DG Regio talk contribs 12,358 bytes +1,375 Created claim: summary (P836): The current state of the sewage treatment system in Malovice and Malovičky is unsatisfactory. Sewage cleaning is carried out in septic tanks and the sewerage is located in Malovice pond. The construction of a new wastewater treatment plant (capacity 400 EO) is proposed with the capacitance of existing free drains through the endurance chambers built on becoming sewer lines. The connection of the sewer network from Malovice to Maloviček will be e...
  • curprev 11:4511:45, 23 October 2020DG Regio talk contribs 10,983 bytes −925 Removed claim: summary (P836): The current status of the wastewater treatment system in Malovice and Maloviáček is unsatisfactory. The treatment of sewage is carried out in a septic tank and the sewer leads to a wall to Malvoke. It is proposed that a new waste water treatment plant (capacity of 400 EO) be built up with the capture of current outlets through the reclining assemblies built on strikes of the sewers. The connection of the sewage network from Malvic to Maloviček...

22 September 2020

17 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 11:2411:24, 26 February 2020DG Regio talk contribs 10,618 bytes +925 Created claim: summary (P836): The current status of the wastewater treatment system in Malovice and Maloviáček is unsatisfactory. The treatment of sewage is carried out in a septic tank and the sewer leads to a wall to Malvoke. It is proposed that a new waste water treatment plant (capacity of 400 EO) be built up with the capture of current outlets through the reclining assemblies built on strikes of the sewers. The connection of the sewage network from Malvic to Maloviček w...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020