Revision history of "Preslav – sewerage and treatment of waste water" (Q61180)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 23:0623:06, 12 October 2024DG Regio talk contribs 50,123 bytes +3 Changed label, description and/or aliases in pt
  • curprev 23:0623:06, 12 October 2024DG Regio talk contribs 50,120 bytes +24 Set a claim value: summary (P836): Está prevista a construção de uma nova estação de tratamento de águas residuais com uma capacidade de 460 EO (e esgotos de águas residuais) na aldeia de Předslav. Um sistema de tratamento contínuo de águas residuais foi concebido para o tratamento de águas residuais. A estação de tratamento de águas residuais destina-se a drenar a sua própria parte da aldeia de Předslav e a importar águas residuais de outras partes administrativas do município. O pe...

23 March 2024

15 January 2024

6 July 2023

12 June 2023

20 February 2023

17 February 2023

24 July 2022

  • curprev 09:2209:22, 24 July 2022DG Regio talk contribs 47,884 bytes +28,201 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 21:4021:40, 2 December 2021DG Regio talk contribs 15,013 bytes +1,341 Created claim: summary (P836): Der Bau einer neuen Kläranlage mit einer Kapazität von 460 EO (und einer separaten Kanalisation) ist im Dorf Předslav geplant. Ein kontinuierliches Abwasserbehandlungssystem ist für die Abwasserbehandlung konzipiert. Die Kläranlage ist darauf ausgelegt, ihren eigenen Teil des Dorfes Předslav zu entwässern und Abwasser aus anderen Verwaltungsteilen der Gemeinde zu importieren. Der eingereichte Beihilfeantrag betrifft nur den Bau eines neuen WWTP...
  • curprev 21:4021:40, 2 December 2021DG Regio talk contribs 13,672 bytes +117 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 22:5822:58, 28 November 2021DG Regio talk contribs 13,555 bytes +1,503 Created claim: summary (P836): La construction d’une nouvelle station d’épuration des eaux usées d’une capacité de 460 EO (et d’un système d’égouts séparé) est prévue dans le village de Předslav. Un système continu de traitement des eaux usées est conçu pour le traitement des eaux usées. La station d’épuration des eaux usées est destinée à drainer sa propre partie du village de Předslav et à importer des eaux usées provenant d’autres parties administratives de la commune. La...
  • curprev 22:5822:58, 28 November 2021DG Regio talk contribs 12,052 bytes +111 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

  • curprev 17:4817:48, 23 October 2020DG Regio talk contribs 12,390 bytes +108 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:4817:48, 23 October 2020DG Regio talk contribs 12,282 bytes −109 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:4817:48, 23 October 2020DG Regio talk contribs 12,391 bytes +1,386 Created claim: summary (P836): The construction of a new sewage treatment plant with a capacity of 460 EO (and sewage sewage sewers) is planned in the village Předslav. A continuous sewage treatment system is designed for wastewater treatment. The sewage treatment plant is designed to drain its own part of the village Předslav and for the import of waste water from other administrative parts of the municipality.The submitted aid application only deals with the construction of...
  • curprev 17:4817:48, 23 October 2020DG Regio talk contribs 11,005 bytes −950 Removed claim: summary (P836): In Preslav, the construction of a new sewage treatment plant with a capacity of 460 EO (and a separate sewage drain) is planned. For waste water treatment a system is proposed for the continuous treatment of waste water. The waste water treatment plant is designed to be recovered from the municipality of Preslav and for the introduction of waste water from other administrative parts of the bypass. the application for aid is only addressed by t...

22 September 2020

17 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 11:2311:23, 26 February 2020DG Regio talk contribs 10,678 bytes +950 Created claim: summary (P836): In Preslav, the construction of a new sewage treatment plant with a capacity of 460 EO (and a separate sewage drain) is planned. For waste water treatment a system is proposed for the continuous treatment of waste water. The waste water treatment plant is designed to be recovered from the municipality of Preslav and for the introduction of waste water from other administrative parts of the bypass. the application for aid is only addressed by the...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020