Revision history of "Ensuring the LAG’s activities" (Q61122)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 23:0623:06, 12 October 2024DG Regio talk contribs 49,064 bytes +1 Changed label, description and/or aliases in pt
  • curprev 23:0623:06, 12 October 2024DG Regio talk contribs 49,063 bytes −72 Set a claim value: summary (P836): O projeto aborda o financiamento dos custos do grupo de ação local. Estes custos estão associados à execução da estratégia de DLBC denominada Renovação da Terra dos Príncipes e Reis 2. Em especial, a administração dos programas operacionais e outras atividades resultantes da estratégia de DLBC, da animação estratégica e da animação das escolas e dos estabelecimentos de ensino no território. O MAS administrará os seguintes programas operacionais: IRO...

22 March 2024

15 January 2024

12 June 2023

17 February 2023

24 July 2022

  • curprev 09:1509:15, 24 July 2022DG Regio talk contribs 46,465 bytes +26,739 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 21:3421:34, 2 December 2021DG Regio talk contribs 15,571 bytes +1,296 Created claim: summary (P836): Das Projekt befasst sich mit der Finanzierung der Kosten der LAG. Diese Kosten hängen mit der Umsetzung der CLLD-Strategie „Restaurierung des Landes der Fürsten und Könige 2“ zusammen. Insbesondere die Verwaltung der operationellen Programme und anderer Maßnahmen, die sich aus der CLLD-Strategie, der Strategieanimation und der Animation von Schulen und Bildungseinrichtungen im Hoheitsgebiet ergeben.MAS verwaltet folgende operationelle Programme:...
  • curprev 21:3421:34, 2 December 2021DG Regio talk contribs 14,275 bytes +98 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 22:5922:59, 28 November 2021DG Regio talk contribs 14,177 bytes +1,372 Created claim: summary (P836): Le projet porte sur le financement des coûts du GAL. Ces coûts sont liés à la mise en œuvre de la stratégie de développement local mené par les acteurs locaux intitulée "Restauration du territoire des princes et des rois 2. En particulier, l’administration des programmes opérationnels et d’autres activités résultant de la stratégie du DLAL, l’animation de la stratégie et l’animation des écoles et des établissements d’enseignement sur le territoi...
  • curprev 22:5922:59, 28 November 2021DG Regio talk contribs 12,805 bytes +89 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

  • curprev 11:3311:33, 23 October 2020DG Regio talk contribs 13,165 bytes +90 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:3311:33, 23 October 2020DG Regio talk contribs 13,075 bytes −90 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:3311:33, 23 October 2020DG Regio talk contribs 13,165 bytes +1,287 Created claim: summary (P836): The project addresses the financing of the costs of the local action group. These costs are linked to the implementation of the CLLD strategy called Renewal of the Land of Princes and Kings 2. In particular, the administration of operational programmes and other activities resulting from the CLLD strategy, strategy animation and animation of schools and school facilities in the territory.MAS will administer the following operational programmes:...
  • curprev 11:3311:33, 23 October 2020DG Regio talk contribs 11,878 bytes −875 Removed claim: summary (P836): The project shall address the financing of the costs of the local action group. These costs are linked to the implementation of the CLLD strategy entitled “Renewal of the country of the booklet and 2”. In particular, it involves the administration of operational programmes and other activities deriving from the CLLD strategy, an animation of the strategy and animation of schools and school facilities in the Territories.MAS will administer the...

24 September 2020

21 September 2020

31 August 2020

28 August 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 11:2511:25, 26 February 2020DG Regio talk contribs 10,966 bytes +875 Created claim: summary (P836): The project shall address the financing of the costs of the local action group. These costs are linked to the implementation of the CLLD strategy entitled “Renewal of the country of the booklet and 2”. In particular, it involves the administration of operational programmes and other activities deriving from the CLLD strategy, an animation of the strategy and animation of schools and school facilities in the Territories.MAS will administer the fo...

17 February 2020

6 February 2020

30 January 2020

28 January 2020

11 January 2020