Revision history of "Improving the management and administrative capabilities of MAS Hranicko z. s." (Q61110)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 23:0623:06, 12 October 2024DG Regio talk contribs 51,928 bytes +1 Changed label, description and/or aliases in pt
  • curprev 23:0623:06, 12 October 2024DG Regio talk contribs 51,927 bytes −10 Set a claim value: summary (P836): O projeto «Melhoria das capacidades administrativas e de gestão do GAL Hranicko z. s.» é elaborado em conformidade com as condições do Desafio n.o 6 do IROP e cumpre o objetivo especial n.o 4.2 do IROP: Reforço das capacidades de desenvolvimento local de base comunitária, a fim de melhorar as capacidades de gestão e administração do GAL. As principais atividades são as atividades de apoio preparatório, as atividades operacionais e de análise do GAL...

22 March 2024

15 January 2024

12 June 2023

20 February 2023

17 February 2023

24 July 2022

  • curprev 09:1309:13, 24 July 2022DG Regio talk contribs 50,247 bytes +29,802 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 21:3321:33, 2 December 2021DG Regio talk contribs 15,689 bytes +1,425 Created claim: summary (P836): Das Projekt „Verbesserung der Management- und Verwaltungskapazitäten der Hranicko z. s LAG“ wird gemäß den Bedingungen der IROP-Aufforderung 6 erstellt, die das spezifische Ziel 4.2 des IROP erfüllt: Stärkung der Kapazitäten der CLLD zur Verbesserung der Verwaltungs- und Verwaltungskapazitäten der LAG. Die wichtigsten Tätigkeiten sind vorbereitende Unterstützungsmaßnahmen, operative und Planungstätigkeiten der LAG während der Umsetzung der SCLLD...
  • curprev 21:3321:33, 2 December 2021DG Regio talk contribs 14,264 bytes +138 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 22:5922:59, 28 November 2021DG Regio talk contribs 14,126 bytes +1,450 Created claim: summary (P836): Le projet «Amélioration des capacités de gestion et d’administration du GAL Hranicko z. s» est préparé conformément aux termes de l’appel no 6 de l’IROP, qui répond à l’objectif spécifique 4.2 du POIR: Renforcer la capacité du DLAL à améliorer les capacités de gestion et d’administration des GAL. Les principales activités sont les activités de soutien préparatoire et les activités opérationnelles et de planification du GAL durant la mise en œuvr...
  • curprev 22:5922:59, 28 November 2021DG Regio talk contribs 12,676 bytes +142 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

  • curprev 11:3211:32, 23 October 2020DG Regio talk contribs 12,983 bytes +137 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:3211:32, 23 October 2020DG Regio talk contribs 12,846 bytes −133 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:3211:32, 23 October 2020DG Regio talk contribs 12,979 bytes +1,413 Created claim: summary (P836): The project “Improving the management and administrative capabilities of the LAG Hranicko z. s.” is prepared in accordance with the conditions of Challenge No.6 IROP, fulfils Special Objective No. 4.2 IROP: Strengthening the capacities of community-led local development in order to improve the management and admin capabilities of the LAG. The main activities are preparatory support activities, LAG operational and screening activities in the impl...
  • curprev 11:3211:32, 23 October 2020DG Regio talk contribs 11,566 bytes −940 Removed claim: summary (P836): In accordance with the terms of the IROP, the project “Improving the management and administrative capacity of LAGs” is prepared in accordance with the terms of the IROP, objective No 4.2 of the IROP fulfils: Strengthening the capacity of community-led local development (CLLD) to improve MAs’ capacities. The main activities are preparatory support activities, operating and debriefing activities of MAS when conducting SCD in 2015-2023. The appr...

24 September 2020

21 September 2020

31 August 2020

28 August 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 11:2511:25, 26 February 2020DG Regio talk contribs 10,728 bytes +940 Created claim: summary (P836): In accordance with the terms of the IROP, the project “Improving the management and administrative capacity of LAGs” is prepared in accordance with the terms of the IROP, objective No 4.2 of the IROP fulfils: Strengthening the capacity of community-led local development (CLLD) to improve MAs’ capacities. The main activities are preparatory support activities, operating and debriefing activities of MAS when conducting SCD in 2015-2023. The approv...

17 February 2020

6 February 2020

30 January 2020

28 January 2020

11 January 2020