Revision history of "Improvement of the management and administrative capacity of the LAG Železnohorský Region" (Q61053)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 08:3408:34, 13 October 2024DG Regio talk contribs 53,260 bytes 0 Changed label, description and/or aliases in pt
  • curprev 08:3408:34, 13 October 2024DG Regio talk contribs 53,260 bytes +39 Set a claim value: summary (P836): O projeto contribuirá para reforçar e melhorar as capacidades administrativas e de gestão do GAL RU na execução da estratégia de desenvolvimento local de base comunitária do GAL RU. A execução do projeto assegurará o funcionamento do gabinete do GAL, a administração dos convites à apresentação de propostas anunciados no âmbito do PR IROP, PRV, Zam e RU, a recolha de candidaturas de projetos do território do GAL e a sua administração ao longo de todo...

7 March 2024

15 January 2024

12 June 2023

17 February 2023

24 July 2022

  • curprev 09:0609:06, 24 July 2022DG Regio talk contribs 50,551 bytes +29,542 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 21:2521:25, 2 December 2021DG Regio talk contribs 15,975 bytes +1,525 Created claim: summary (P836): Das Projekt wird zur Stärkung und Verbesserung der Verwaltungs- und Verwaltungskapazitäten der žr LAG im Rahmen der Umsetzung der von der örtlichen Bevölkerung betriebenen lokalen Entwicklungsstrategie der žr LAG beitragen. Im Rahmen der Projektdurchführung wird der Betrieb des LAG-Büros sichergestellt, die Verwaltung der angekündigten Aufforderungen im Rahmen des PR IROP, RDP, Zam und des EVU, die Sammlung von Projektanträgen von Einrichtungen...
  • curprev 21:2521:25, 2 December 2021DG Regio talk contribs 14,450 bytes +149 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 22:5922:59, 28 November 2021DG Regio talk contribs 14,301 bytes +1,542 Created claim: summary (P836): Le projet contribuera au renforcement et à l’amélioration des capacités de gestion et d’administration du GAL de žr dans le cadre de la mise en œuvre de la stratégie communautaire de développement local du GAL žr. Dans le cadre de la mise en œuvre du projet, le fonctionnement du bureau du GAL sera assuré, l’administration des appels annoncés dans le cadre du PR IROP, du PDR, de Zam et de l’EF, la collecte des demandes de projets d’entités du ter...
  • curprev 22:5922:59, 28 November 2021DG Regio talk contribs 12,759 bytes +162 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 11:3611:36, 23 October 2020DG Regio talk contribs 13,046 bytes +150 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:3611:36, 23 October 2020DG Regio talk contribs 12,896 bytes −120 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:3611:36, 23 October 2020DG Regio talk contribs 13,016 bytes +1,438 Created claim: summary (P836): The project will contribute to strengthening and improving the management and administrative capacities of the RU LAG in the implementation of the Community-led Local Development Strategy of the RUG. The implementation of the project will ensure the operation of the LAG office, administration of announced calls within the PR IROP, PRV, Zam and RU, collection of project applications from the LAG territory, their administration throughout the proj...
  • curprev 11:3611:36, 23 October 2020DG Regio talk contribs 11,578 bytes −970 Removed claim: summary (P836): The project will contribute to strengthening and improving the managing and administrative capacity of the R & D LAGs as part of the implementation of the CLLD strategy. The implementation of the project will ensure the running of the LAG office, the administration of the announced IROP, RDP, zam and the RU, the collection of project applications from the LAG’s territory, their administration throughout the project process. The implementation...

24 September 2020

21 September 2020

31 August 2020

28 August 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 11:2411:24, 26 February 2020DG Regio talk contribs 10,768 bytes +970 Created claim: summary (P836): The project will contribute to strengthening and improving the managing and administrative capacity of the R & D LAGs as part of the implementation of the CLLD strategy. The implementation of the project will ensure the running of the LAG office, the administration of the announced IROP, RDP, zam and the RU, the collection of project applications from the LAG’s territory, their administration throughout the project process. The implementation of...

17 February 2020

6 February 2020

30 January 2020

28 January 2020

11 January 2020