Revision history of "Rudník sewerage construction work" (Q60649)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 11:1011:10, 12 October 2024DG Regio talk contribs 51,357 bytes +3 Changed label, description and/or aliases in pt
  • curprev 11:1011:10, 12 October 2024DG Regio talk contribs 51,354 bytes +11 Set a claim value: summary (P836): O projeto resolve a drenagem segura de águas residuais da aldeia anteriormente não selada de Rudník e das suas partes locais para a estação de tratamento de águas residuais existente e satisfatória de Hostinné. O objeto do pedido é apenas a construção de esgotos. Redes de esgotos de xxxx m recém-concebidas – 9232 m linhas de esgotos gravitacionais (DN 250 – DN 300), 246,5 m de deslocamento – 6 secções que cruzam os caudais de água locais (PE 80, PE...

22 March 2024

15 January 2024

22 December 2023

12 June 2023

20 February 2023

17 February 2023

24 July 2022

  • curprev 08:2508:25, 24 July 2022DG Regio talk contribs 48,386 bytes +28,516 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 21:4521:45, 2 December 2021DG Regio talk contribs 15,347 bytes +1,339 Created claim: summary (P836): Das Projekt löst die sichere Ableitung von Abwasser aus dem zuvor unbefüllten Dorf Rudník und seinen lokalen Teilen zur bestehenden und konformen Kläranlage Hostinné. Gegenstand des Antrags ist nur der Bau von Abwasserkanälen. Neu konstruiertes Abwassersystem xxxx m – 9 232 m Schwerkraftkanalleitungen (DN 250 – DN 300), 246,5 m Ableitungen – 6 Abschnitte von lokalen Wasserläufen (PE 80, PE 100), 6 neue Tankstellen (1 pro Druckabschnitt). Die Umw...
  • curprev 21:4521:45, 2 December 2021DG Regio talk contribs 14,008 bytes +87 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 22:5322:53, 28 November 2021DG Regio talk contribs 13,921 bytes +1,392 Created claim: summary (P836): Le projet résout le drainage sûr des eaux usées du village de Rudník et de ses parties locales jusqu’à l’usine de traitement des eaux usées existante et conforme à Hostinné. L’objet de la demande n’est que la construction d’égouts. Nouveau système d’égouts xxxx m — 9 232 m de conduites d’égouts par gravité (DN 250 — DN 300), 246,5 m de rejets — 6 sections de cours d’eau locaux traversés (PE 80, PE 100), 6 nouvelles stations-service (1 pour chaqu...
  • curprev 22:5322:53, 28 November 2021DG Regio talk contribs 12,529 bytes +109 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 10:4710:47, 23 October 2020DG Regio talk contribs 12,869 bytes +93 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:4710:47, 23 October 2020DG Regio talk contribs 12,776 bytes −99 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:4710:47, 23 October 2020DG Regio talk contribs 12,875 bytes +1,381 Created claim: summary (P836): The project solves the safe draining of sewage water from the previously unsealed village of Rudník and its local parts to the existing and satisfactory wastewater treatment plant Hostinné. The object of the application is only the construction of sewer sewers. Newly designed xxxx m sewage sewerage – 9232 m gravitational sewer lines (DN 250 – DN 300), 246.5 m displacements – 6 sections intersecting local water flows (PE 80, PE 100), 6 new pumpin...
  • curprev 10:4710:47, 23 October 2020DG Regio talk contribs 11,494 bytes −943 Removed claim: summary (P836): The project addresses the safe channelling of the sewage effluents from the still unpaid municipalities of Rudnik and its local parts to existing and compliant WWTP. The only subject-matter of the application is the construction of a sewerage base. The newly proposed xxxx m of the sewage system is 9 232 m of the gravitational sewer system (DN 250 — DN 300), 246.5 m from the cut-out of 6 sections of cross-local water watercourses (PE 80, PE 100...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 11:0411:04, 26 February 2020DG Regio talk contribs 11,162 bytes +943 Created claim: summary (P836): The project addresses the safe channelling of the sewage effluents from the still unpaid municipalities of Rudnik and its local parts to existing and compliant WWTP. The only subject-matter of the application is the construction of a sewerage base. The newly proposed xxxx m of the sewage system is 9 232 m of the gravitational sewer system (DN 250 — DN 300), 246.5 m from the cut-out of 6 sections of cross-local water watercourses (PE 80, PE 100),...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020